Loading...
HomeMy WebLinkAboutB16-0087_M1.0_1478901776.pdfRADIANT FLOOR SUPPLY RADIANT FLOOR RETURN NOTE: ALL SYMBOLS SHOWN ON LEGEND ARE NOT NECESSARILY USED. CHILLED WATER RETURN CHILLED WATER SUPPLY HEATING WATER RETURN HEATING WATER SUPPLY MECHANICAL LEGEND MEDIUM PRESSURE NATURAL GAS SNOWMELT RETURN SNOWMELT SUPPLY GAS HWS T A B HWR CWS CWR SMS SMR RFS RFR G MPG PIPE RISER PIPE DROP PIPE TAKEOFF (FROM BOTTOM OF MAIN) PIPE TAKEOFF (FROM TOP OF MAIN) PIP END CAP PIPE CONTINUATION PIPE EXPANSION GUIDE PIPE UNION PIPE ANCHOR FLEXIBLE PIPE CONNECTION PIPE EXPANSION JOINT POINT OF NEW CONNECTION AIR VENT PLUG VALVE CHECK VALVE BALL VALVE BALANCING VALVE BUTTERFLY VALVE PRESSURE REDUCING VALVE STRAINER PRESSURE - TEMP. TAP PRESSURE GAUGE 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE SUPPLY GRILLE RETURN GRILLE EXHAUST AIR SUPPLY AIR RETURN AIR OUTDOOR AIR SUPPLY AIR DAMPER RETURN AIR DAMPER SUPPLY DIFFUSER OA RA SA EA RAD SAD SG RG SD RETURN DIFFUSER RD TRANSFER GRILLE TG TRANSFER DIFFUSER TD THERMOSTAT FIRE/SMOKE DAMPER FIRE DAMPER MOTOR OPERATED DAMPER (MOD) MANUAL BALANCING DAMPER 7851,1* 9$1(6 ,1 ƒ (/%2: ??x?? DUCT SIZES ARE NET FREE AREA 1ST NO. IS DUCT WIDTH. 2ND NO. IS DUCT DEPTH. SECTION THRU SUPPLY AIR DUCT SECTION THRU RETURN/EXHAUST AIR DUCT SUPPLY DUCT TURN DOWN RETURN/EXHAUST DUCT TURN DOWN CHANGE OF ELEVATION FLEXIBLE DUCT CONNECTION R/D (D) DROP (R) RISE SENSOR (CALL OUT ON DRAWINGS) SUPPLY REGISTER/DIFFUSER/LOUVER NECK SIZE CFM-S RETURN REGISTER/DIFFUSER/LOUVER NECK SIZE CFM-R OUTSIDE AIR REGISTER/DIFFUSER/LOUVER NECK SIZE CFM-O.A. EXHAUST REGISTER/DIFFUSER/LOUVER NECK SIZE CFM-E U DOOR UNDERCUT CFM (A) SECTION CUT LINE (B) SHEET SHOWN ON S SECTION THRU ROUND DUCT ROUND DUCT TURN DOWN 4-WAY CONTROL VALVE FLOW REGULATOR VALVE DIFFERENTIAL BYPASS VALVE NATURAL GAS PRESSURE REGULATOR THERMOMETER SEQUENCE OF OPERATION: B-1 & B-2: THE OPERATION OF THESE BOILERS AND THEIR CIRCULATING PUMPS, SHALL BE CONTROLLED VIA A STAND ALONE INTEGRAL CONTROL. UPON A CALL FOR SPACE HEATING FROM WALL MOUNTED T-STATS THE BOILERS SHALL FIRE AND MAINTAIN A ',6&+$5*( :$7(5 7(03(5$785( 2) 0$; ƒ ) $7 7+( 0$,1 /223 6833/< SENSOR, AND THE PRIMARY PUMPS P-4, P-5, OR P-6 (RESPECTIVELY) SHALL OPERATE. THE BOILER CONTROLLERS SHALL INCLUDE AN OUTDOOR RESET SCHEDULE FOR 63$&( +($7,1* ,) :$7(5 *5($7(5 7+$1 ƒ ) ,6 (9(5 5($/,=(' $7 7+( 6833/< SENSOR, THE BOILERS AND THEIR PUMPS SHALL BE DISABLED. UPON A CALL FOR DOMESTIC HOT WATER, THE PUMP P-3 SHALL BE ENERGIZED. B-2 & B-3 6+$// ),5( $1' 5$03 83 72 0$,17$,1 ƒ ) $'- $7 7+( 6833/< :$7(5 SENSOR UNTIL CALL IS MET. DURING DOMESTIC WATER CALL DISABLE SNOWMELT PRIMARY PUMP P-6. SZ-1 & SZ-2: THE SNOWMELT ZONE VALVES SHALL BE INTERLOCKED WITH A DEDICATED TEKMAR 667 CONTROL PANEL WITH ASSOCIATED 090/091 COMBINATION SOCKET / SENSOR. THE TEKMAR CONTROLLER SHALL BE INTERLOCKED WITH A SYSTEM PUMP P-6 & P-7. WHEN MOISTURE IS DETECTED ON THE SENSOR AND TEMPERATURE IS BELOW FREEZING, THE SYSTEM SHALL BE ENERGIZED VIA THE TEKMAR 667 CONTROLLER. THE ASSOCIATED SNOWMELT P-6 & P-7 PUMPS SHALL ENERGIZE, AND BOILER B-1 & B-2 6+$// %( (1$%/(' 72 0$,17$,1 6833/< 7(03(5$785( 35,0$5< $7 ƒ ) $'- 6(&21'$5< $7 ƒ ) $'- 3529,'( ,'/,1* )($785( :+(1 287'225 7(03(5$785( '5236 %(/2: ƒ ) (1(5*,=( 7+( 612:0(/7 6<67(0 $1' 0$,17$,1 6/$% 7(03(5$785( $7 ƒ ) ,) 7+( 612:0(/7 6(1625 6(16(6 MOISTURE THE SNOWMELT SYSTEM SHALL FIRE UP AND MAINTAIN SLAB 7(03(5$785( $7 ƒ ) 3529,'( 6/$% 3527(&7,21 9,$ 7(.0$5 &21752//(5 BB-1 TO BB-74: EACH ZONE (GROUP) OF BASEBOARDS SHALL BE EQUIPPED WITH A ZONE VALVE INTERLOCKED WITH A WALL MOUNTED HEATING ONLY T-STAT (EXCEPT IN THE MECHANICAL ROOMS & WATER ENTRY ROOM WHERE HEATING / COOLING T-STATS SHALL BE PROVIDED). UPON A CALL FOR HEATING FROM ANY WALL MOUNTED T-STAT THE RESPECTIVE ZONE VALVE SHALL OPEN, THE P-4 PUMP SHALL BE ENERGIZED AND HEATING SHALL BE PROVIDED IN THAT ZONE. ERV-1: THIS UNIT SHALL RUN CONTINUOUSLY TO PROVIDE POSITIVE PRESSURIZATION TOWARDS THE HALLWAY COMMUNICATING WITH THE APPARATUS BAY. HRV-1: THIS HRV UNIT SHALL BE INTERLOCKED WITH LIGHTS ON/OFF SWITCH IN THE RESTROOM, WITH REVERSE ACTING T-STAT & HUMIDISTAT IN THE WATER ENTRY ROOM, AND PUSH BUTTON (OR MOTION SENSORS, COORDINATE WITH THE OWNER) IN CLEAN ROOM, STORAGES, & WORKSHOP. UPON A CALL FROM ANY T-STAT, HUMIDISTAT, OR PUSH BUTTON THE HRV-1 SHALL BE ENERGIZED AS INDICATED BELOW:  :+(1 7+( 7(03(5$785( ,1 7+( :$7(5 (175< 5220 5,6(6 $%29( ƒ ) $'- THE HRV-1 SHALL BE ENERGIZED AND PROVIDE VENTILATION UNTIL THE 7(03(5$785( '5236 %(/2: ƒ ) $'- ,) 12 386+ %87721 ,6 35(66(' CONCURRENTLY AND/OR T-STAT IN THE WATER ENTRY ROOM IS SATISFIED, THE DUCT TEMPERATURE SENSOR FOR HC-1 SHALL BE DISABLED. - WHEN THE HUMIDITY IN THE WATER ENTRY ROOM RISES ABOVE 80% (ADJ.) THE HRV-1 SHALL BE ENERGIZED AND PROVIDE VENTILATION UNTIL THE HUMIDITY DROPS BELOW 55% (ADJ.). IF ANY OTHER ZONE(S) ARE SATISFIED AND NO PUSH BUTTON IS PRESSED CONCURRENTLY, THE DUCT TEMPERATURE SENSOR SHALL BE DISABLED. - IF THE PUSH BUTTON IS PRESSED THE HRV-1 SHALL BE ENERGIZED FOR 30 MINUTES (ADJ.). THE DUCT SENSOR SHALL BE ENABLED. THE PUSH BUTTON SHALL HAVE PRIORITY OVER THE T-STATS OR HUMIDISTAT AND FRESH AIR DELIVERED INTO THE SPACE SHALL BE REHEATED (SEE HC-2 SEQUENCE). IF DURING THE REHEAT ANY REVERSE ACTING T-STAT OR HUMIDISTAT CALLS FOR OPERATION THE DUCT SENSOR CAN BE DISABLED AFTER THE PUSH BUTTON IS RELEASED (AFTER 30 MINUTES (ADJ.) UNLESS PUSHED AGAIN). HRV-2 & 3: THESE UNITS SHALL BE INTERLOCKED WITH ON/OFF LIGHT SWITCH IN THE BATHROOMS AND HUMIDISTAT IN THE KITCHEN OR LIVING AREA AND IN EACH BEDROOM. IF HUMIDITY RISES ABOVE 60% (ADJ.) OR THE BATHROOM LIGHT IS TURNED ON, THE RESPECTIVE ERV SHALL BE ENERGIZED. DE-ENERGIZE HRVs IF THE HUMIDITY DROPS BELOW 35% (ADJ.). THE DISCHARGE DUCT MOUNTED TEMPERATURE SENSOR SHALL ENERGIZE HC-3 OR HC-4 RESPECTIVELY AND PROVIDE AIR REHEAT, SEE HC-3 & HC-4 COIL SEQUENCE. HC-1, 2, 3, & 4: EACH HC COIL SHALL BE INTERLOCKED WITH ITS RESPECTIVE ERV DISCHARGE DUCT MOUNTED TEMPERATURE SENSOR. WHEN THE TEMPERATURE OF THE ERV ',6&+$5*( $,5 '5236 %(/2: ƒ ) $'- 7+( 5(63(&7,9( HC COIL SHALL BE ENERGIZED AND 2-WAY MODULATING VALVE SHALL MODULATE FLOW TO MAINTAIN ƒ ) $'- $,5 ',6&+$5*( 7(03(5$785( HC-2 COIL SHALL BE DISABLED FOR VENTILATION PURPOSES AS DESCRIBED IN HRV-1 SEQUENCE. (E) PLYMOVENT: THE EXISTING EXHAUST SYSTEM SHALL BE REWORKED AND RE-ROUTED TO A NEW LOCATION AS INDICATED IN THE FLOOR PLAN. THE SEQUENCE OF OPERATION SHALL BE EXISTING AND REMAIN. COORDINATE WITH AIRPRO, INC. REWORK OF THIS EQUIPMENT AND FEASIBILITY OF REUSING IT PRIOR TO PRICING OR WORK. FURTHER DETAILS BEYOND THESE PLANS TO BE PROVIDED BY AIRPRO, INC. (E) RADIANT EXISTING RADIANT HEATERS SHALL BE REWORKED AS INDICATED ON THESE PLANS HEATERS: AND RE-ROUTED TO A NEW LOCATION. THE SEQUENCE OF OPERATION SHALL BE EXISTING AND REMAIN. IF THE EXISTING HEATERS, TUBING, AND VACUUM PUMP CANNOT BE REUSED REPLACE WITH GORDON CORAYVAC SYSTEM AS INDICATED ON THE PLANS. MATCH CAPACITY. COORDINATE WITH THE MANUFACTURER PRIOR TO PRICING AND ANY WORK. MECHANICAL SPECIFICATIONS: 1. GENERAL: a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN. b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS. 2. WORKMANSHIP: a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT. 3. MATERIALS: a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED. 4. SITE INSPECTION: a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK. b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. 5. CODES AND PERMITS: a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL MECHANICAL CODE (IMC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT. b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT. 6. AS-BUILTS: a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. 7. GUARANTEE: a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. 8. SUBMITTALS: a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALL OPTIONS CLEARLY MARKED) SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED. PERFORMANCE SELECTIONS REQUIRED FOR ERVS, HEAT EXCHANGERS, HEATING COILS, BASEBOARDS, BOILERS, AND PUMPS INDICATING PROPER SIZING AND SELECTION AT ELEVATION. 9. COORDINATION: a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE. b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC. 10. CUTTING AND PATCHING: a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK. b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT. c. X-RAY SLABS PRIOR TO CORING. 11. CLEANUP: a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY. 12. MECHANICAL IDENTIFICATION a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON EQUIPMENT. b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING DIRECTION OF FLOW. c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER. d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE ENGINEER FOR RECORD. 13. DUCTWORK: a. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2012 IMC AND SMACNA STANDARDS. b. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES INDICATED ARE INSIDE TO INSIDE [OUTSIDE TO OUTSIDE] DIMENSIONS. c. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR MESH. d. ALL FINAL CONNECTIONS TO SUPPLY GRILLES SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESS OTHERWISE NOTED ON THE PLANS. MINIMUM LENGTH IS 3', MAXIMUM LENGTH IS 5'. e. FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED, VINYL COATED, WIRE REINFORCED FIBERGLASS, WITH MAXIMUM THERMAL CONDUCTIVITY OF 0.30 BTU-IN/HR-FT2-ƒF AND A MAXIMUM LENGTH OF FIVE FEET. f. CLOTHES DRYER VENT EXHAUST DUCTWORK SHALL BE ALUMINUM. DUCTWORK SHALL NOT BE CONNECTED OR INSTALLED WITH SHEET METAL SCREWS OR OTHER FASTENERS THAT WILL OBSTRUCT THE EXHAUST FLOW. TERMINATE WITH A WALL CAP WITH A BACK DRAFT DAMPER. SCREENS ARE PROHIBITED. REFER TO SECTION 504 OF THE 2012 IMC FOR MAXIMUM DRYER EXHAUST DUCT LENGTHS. g. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE DROP PER 100 FEET. h. EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES. i. CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATION j. '28%/( 7+,&.1(66 7851,1* 9$1(6 6+$// %( 86(' 21 $// '8&7 78516 2) ƒ 14. HEATING PIPING: a. +($7,1* +27 :$7(5 3,3,1* ò´ ,1&+(6 $1' %(/2: 6+$// %( 7<3( / &233(5 +$5' '5$:1 :,7+ WROUGHT COPPER SWEAT FITTINGS. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER. CONDENSER WATER AND HEATING HOT WATER PIPING 3" AND ABOVE SHALL BE SCHEDULE 40 BLACK STEEL A-53 SEAMLESS PIPE WITH WELDED FITTINGS. b. VALVES SHALL BE DANFOSS OR EQUAL; SERVICE PRESSURE SHALL BE AS REQUIRED. VALVES SHALL BE SUITABLE FOR SERVICE INTENDED. PROVIDE PRESSURE INDEPENDENT CONTROL VALVE MODELS FOR ALL VARIABLE SPEED SYSTEMS UNLESS NOTED OTHERWISE. c. PROVIDE HANGERS, SUPPORTS AND INSULATION SADDLES AS REQUIRED AND PER ANSI REQUIREMENTS. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE. a. PIPING SHALL BE SIZED AT A MAXIMUM PRESSURE DROP OF 3.5 FT PER 100 FEET & 4 FEET/SEC VELOCITY. UNLESS OTHERWISE NOTED, ALL PIPING SHOWN ON PLANS HAS BEEN SIZED FOR COPPER. PROVIDE DEDUCT ALTERNATE PRICING FOR PEX. b. CONTROL VALVE CV RATINGS SHALL BE SELECTED AT A MAXIMUM PRESSURE DIFFERENTIAL ACROSS THE VALVE OF 2 PSI. c. 3529,'( ´ ',$ ;  / 6&+('8/(  39& ,1/,1( ),/7(5 ),//(' :,7+ /,0(6721( $**5(*$7( 72 NEUTRALIZE THE BOILER'S CONDENSATE DRAIN. d. PROVIDE EXPANSION JOINTS OR LOOPS ON ALL HEATING WATER PIPING RUNS IN EXCESS OF 50'. 15. DUCTWORK INSULATION: a. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 OF THE 2012 IMC. b. INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 50, PER THE 2012 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS. c. RECTANGULAR SUPPLY, RETURN & TRANSFER DUCTWORK SHALL BE INTERNALLY LINED WITH A VAPOR RESISTANT DUCT LINER OF THICKNESSES SPECIFIED BELOW. d. CONCEALED ROUND, CONCEALED OVAL & OUTDOOR AIR DUCTS SHALL BE EXTERNALLY WRAPPED WITH FIBERGLASS INSULATION WITH AN EXTERNAL VAPOR BARRIER. REQUIRED R-VALUES ARE SPECIFIED BELOW. e. ALL SUPPLY, RETURN & TRANSFER DUCTWORK LOCATED WITHIN THE BUILDING ENVELOPE SHALL BE ,168/$7(' 72 $ 0,1,080 2) 5 ´ /,1(5 81/(66 63(&,),(' 27+(5:,6( 21 7+( 3/$16 f. ALL SUPPLY DUCTWORK SERVING EHU UNITS LOCATED IN ATTICS OR OTHER UNCONDITIONED 63$&(6 6+$// %( ,168/$7(' 72 $ 0,1,080 2) 5 ´ /,1(5 $// 27+(5 '8&76 ,1 81&21',7,21(' 63$&(6 6+$// %( ,168/$7(' 72 $ 0,1,080 2) 5 ´ /,1(5 g. ALL SUPPLY & RETURN DUCTWORK SERVINF FIRE STATION AND QUARTERS SHALL BE INSULATED TO A 0,1,080 2) 5 ´ /,1(5 :+(1 /2&$7(' ,1 81&21',7,21(' 63$&(6 $1' 6+$// %( ,168/$7(' 72 $ 0,1,080 2) 5 ´ /,1(5 $1' :($7+(53522)(' :+(1 /2&$7(' 2876,'( 7+( %8,/',1* h. ALL OUTDOOR AIR DUCTS SHALL BE INSULATED TO A MINIMUM OF R-6 WITH A VAPOR BARRIER. 16. PIPING INSULATION: a. ALL HYDRONIC PIPING SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 1204 OF THE 2012 IMC. b. INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 450, PER THE 2012 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS. c. ALL HYDRONIC PIPING INSULATION SHALL HAVE A THERMAL CONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-ƒF. d. $// +($7,1* :$7(5 3,3,1* ´ 25 60$//(5 6+$// %( ,168/$7(' :,7+ ´ 7+,&.1(66 +($7,1* :$7(5 3,3,1* /$5*(5 7+$1 ´ 6+$// %( ,168/$7(' :,7+ ´ 7+,&.1(66 e. ALL PIPING ROUTED BELOW THE SLAB UNDERGROUND SHALL BE TYPE "K" COPPER AND SHALL BE INSULATED WITH ARMIFLEX TYPE INSULATION. 17. TEMPERATURE CONTROL DEVICES: a. CONTRACTOR SHALL PROVIDE STAND-ALONE CONTROLS CAPABLE OF MEETING THE SEQUENCE OF OPERATION DESCRIBED ON SHEET M1.0. b. THE HVAC SYSTEM SHALL BE PROVIDED WITH 7-DAY PROGRAMMABLE AUTOMATIC SPACE TEMPERATURE CONTROL DEVICES (THERMOSTATS) AS SHOWN ON THE PLANS. THE THERMOSTATS SHALL BE CAPABLE OF SCHEDULING OCCUPANCIES AND PROVIDING SETBACK CAPABILITIES TO 0$,17$,1 =21( 6(732,176 '2:1 72 ƒ) 25 83 72 ƒ) c. &21752/6 6+$// %( &$3$%/( 2) 3529,',1* $ '($'%$1' 2) $7 /($67 ƒ) %(7:((1 +($7,1* $1' COOLING. d. 7+(50267$76 6+$// +$9( 180(5,& 6(7 32,176 ,1 ƒ) $'-867$%/( 6(732,17 67236 $1' 6+$// BE MOUNTED AT 46" ABOVE FINISHED FLOOR ADJACENT TO THE ROOM'S LIGHT SWITCH. e. COORDINATE CONTROL TIE-INS WITH CONTROLS CONTRACTOR AS NECESSARY. f. ALL THERMOSTATS SHALL BE APPROVED BY THE OWNER. 18. SNOWMELT INSULATION: a. INSULATION SHALL BE INSTALLED UNDER ALL SNOWMELT AREAS, MINIMUM R-10. CONFIRM COMPRESSIVE STRENGTH RATING REQUIREMENTS WITH THE STRUCTURAL ENGINEER FOR EACH APPLICATION. INSULATION UNDER TRAFFIC AREAS MUST BE TRAFFIC RATED. BUBBLE-TYPE INSULATION IS PROHIBITED ENTIRELY. 19. GAS APPLIANCE VENTING: a. ACCEPTABLE VENT MATERIALS, ROUTING, DISTANCE AND TERMINATION LOCATIONS SHALL COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ALL REQUIREMENTS IN CHAPTER 8 OF THE 2012 IMC. PVC PIPING IS NOT ACCEPTED FOR BOILER OR WATER HEATER VENTING. POLYPROPYLENE PIPING MUST BE APPROVED FOR USE WITH APPLIANCE MANUFACTURER. 20. WATER QUALITY: a. HEATING AND CHILLED WATER CONDITIONS SHALL BE WITHIN HARDNESS AND PH RANGE SUITABLE FOR MECHANICAL EQUIPMENT (PER MANUFACTURER). CONTRACTOR TO TEST CONDITIONS PRIOR TO SYSTEM FILL. WATER SOFTENERS OR OTHER DEVICES MAY BE REQUIRED TO IMPROVE WATER QUALITY. b. INCLUDE CORROSION INHIBITORS ON ALL PROPYLENE GLYCOL MIXTURES. c. PRIOR TO SYSTEM FILL, ALL TUBING SYSTEMS AND MANIFOLDS SHALL BE CLEANED AS PRESCRIBED BY THE TUBING MANUFACTURER. SUPPLY ALL TOOLS, CONNECTIONS, LABOR, AND ACCESSORIES NECESSARY TO PROPERLY REMOVE ALL FOREIGN MATERIAL, CHEMICAL, AND RESIDUE WITHIN THE TUBING SYSTEM BEFORE PERMANENTLY CHARGING THE SYSTEM AND PLACING INTO OPERATION. 21. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR. 22. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS. 23. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR. 24. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS. 25. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION. 26. TEST & BALANCING: a. THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST AND BALANCE COMPANY. b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ELECTRONIC DISTRIBUTION PREFERRED. c. ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE CONTRACTOR. d. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS. 27. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT). 28. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL. 29. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION & MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES. 30. FILTERS: a. SHALL BE UL RATED AND APPROVED. b. PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE. 31. ELECTRICAL CONNECTIONS: a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY THE MECHANICAL CONTRACTOR. b. UNLESS OTHERWISE SPECIFIED, ALL MOTORIZED DAMPERS SHALL BE LOW VOLTAGE. ALL WIRING AND POWER CONNECTIONS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. c. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE DRAWINGS. d. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS. e. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL. f. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION. g. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR. 32. TEMPORARY HEATING DURING CONSTRUCTION: a. MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING. b. GAS FIRED TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% /'%*#0+%#. .')'0& 52'%ž5  5'37'0%' /   06/14/16