Loading...
HomeMy WebLinkAboutB16-0087_M2.0_1478903651.pdfMECH ROOM BUNKER GEAR 1ST FLR HALLWAY STAIRS PUBLIC RESTROOM UP WD D E C 5 6 4 1 3 2 7 A B 8 F.1 F.2 F.3 F.4 7.5 A1 4.9 7A 7B 7C UP GYM CONFERENCE ROOM OFFICE A OFFICE B OFFICE HALLWAY ENTRY APPARATUS BAY CLEAN ROOM STORAGE HALLWAY STORAGE ROOM 2 STORAGE ROOM 1 1 2 B 1 B 2 GF 1 WH 1 HX 1 BB 2 BB 1 BB 4 BB 5 BB 6 BB 11 BB 7 BB 8 BB 9 BB 10 BB 15 BB 14 BB 13 BB 26 BB 25 BB 16 BB 17 BB 18 BB 19 BB 22 BB 23 SHEET DETAIL NOTES: 3/4" HWS UP TO BB-31. 3/4" HWS DOWN FROM BB-31. 3/4" HWS UP TO BB-32. 3/4" HWS DOWN FROM BB-29. 3/4" HWS UP TO BB-26. 3/4" HWS DOWN FROM BB-26. 3/4" HWS UP TO BB-30. 3/4" HWR DOWN FROM BB-30. 3/4" HWS UP TO BB-27. 3/4" HWR DOWN FROM BB-27. 3/4" HWS UP TO BB-33. 3/4" HWS DOWN FROM BB-34. 19 8 12 2 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWR 3/4" HWS 3/4" HWR 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWR 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS/R 3/4" HWS/R 2'-0" 2'-0" 3'-0" 3'-0" 2'-0" 5'-0" 5'-0" 5'-0" 5'-0" 6'-0" 3'-0" 8'-0" 6'-0" 6'-0" 6'-0" 6'-0" 8'-0" 8'-0" 7'-0" 7'-0" 8'-0" EPO 3/4" HWS 3/4" HWS/R 3/4" HWR 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 1-1/2" HWS/R 2" HWS/R 2" HWS/R HRV-1 HC-2 1" HWS/R 1" HWS/R 3/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1" HWS/R GF 2 P 2 P 1 P 3 P 4 P 5 P 6 P 7 1 3 3 4 5 6 7 8 9 10 9 10 11 11 12 13 3/4" HWS UP TO BB-28. 3/4" HWR DOWN FROM BB-28. 3/4" HWS UP TO BB-24. 3/4" HWS DOWN FROM BB-24. 3/4" HWS UP TO BB-23. 3/4" HWR DOWN FROM BB-23. 3/4" HWS UP TO BB-25. 3/4" HWS DOWN FROM BB-25. 3/4" HWS UP TO BB-22. 3/4" HWR DOWN FROM BB-69. 14 13 14 15 16 17 18 15 16 17 18 19 20 21 22 20 21 22 23 ROUTE ABOVE CEILING. 3/4" HWS/R TO HC-2. ROUTE 1-1/4" HWS/R FROM HC COILS AND 2" HWS/R FROM BASEBOARDS TO MAIN BOILER LOOP. RE: BOILER PIPING DIAGRAM ON M1.3 INSTALL B-1 & B-2 PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. ROUTE 3/4" CONDENSATE DRAIN TO THE NEAREST FLOOR DRAIN VIA NEUTRALIZATION BASIN. TERMINATE VIA AIR GAP. FOR VENTING RE: M3.0 PLAN 23 23 23 23 23 23 23 23 23 23 23 GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3. ALL MECHANICAL PIPING SHOWN DASHED SHALL BE ROUTED TO FLOOR ABOVE. 4. VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS SHOWN ON PLANS. 5. LOCATION OF ALL THERMOSTATS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. 6. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 7. ALL BASEBOARD LOOPS SHALL BE EQUIPPED WITH A ZONE VALVE INTERLOCKED WITH THEIR RESPECTIVE WALL MOUNTED T-STATS AND EQUIPPED WITH ISOLATING VALVES IN THE BASEBOARD ENCLOSURE. ALL LOOPS AND BASEBOARDS SHALL BE INSTALLED TO ALLOW SAFE DRAINING. 24 24 BB 20 10'-0" BB 3 6'-0" 3/4" HWS BB 21 5'-0" BB 24 5'-0" 25 25 3/4" HWR 3/4" HWS/R 26 26 26 BB 12 3'-0" 3/4" HWS/R 3/4" HWS/R T T T T T T T T TO BB-14,15 TO BB-13 TO BB-6 TO BB-10 TO BB-1 - 5 T TO BB-9 - 12 T TO BB-23,24 TO BB-21,22 TO BB-16 - 20 TO BB-25, 26 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  2+2+0) 2.#0 5%#.'   žÄ /   NORTH LEVEL 1 PIPING PLAN SCALE: 3/16" = 1'0" 06/14/16