HomeMy WebLinkAboutB16-0087_M2.0_1478903651.pdfMECH
ROOM
BUNKER GEAR
1ST FLR HALLWAY
STAIRS
PUBLIC
RESTROOM
UP
WD
D E C
5
6
4
1
3
2
7
A
B
8
F.1 F.2 F.3 F.4
7.5
A1
4.9
7A
7B
7C
UP
GYM
CONFERENCE
ROOM
OFFICE
A
OFFICE
B
OFFICE
HALLWAY
ENTRY
APPARATUS BAY
CLEAN
ROOM
STORAGE
HALLWAY
STORAGE
ROOM 2
STORAGE
ROOM 1
1
2
B
1
B
2
GF
1
WH
1
HX
1
BB
2
BB
1
BB
4
BB
5
BB
6
BB
11
BB
7
BB
8
BB
9
BB
10
BB
15
BB
14
BB
13
BB
26
BB
25
BB
16
BB
17
BB
18
BB
19
BB
22
BB
23
SHEET DETAIL NOTES:
3/4" HWS UP TO BB-31.
3/4" HWS DOWN FROM BB-31.
3/4" HWS UP TO BB-32.
3/4" HWS DOWN FROM BB-29.
3/4" HWS UP TO BB-26.
3/4" HWS DOWN FROM BB-26.
3/4" HWS UP TO BB-30.
3/4" HWR DOWN FROM BB-30.
3/4" HWS UP TO BB-27.
3/4" HWR DOWN FROM BB-27.
3/4" HWS UP TO BB-33.
3/4" HWS DOWN FROM BB-34.
19
8
12
2
3/4" HWS
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWS
3/4" HWS/R
3/4" HWS/R
2'-0" 2'-0"
3'-0"
3'-0"
2'-0"
5'-0"
5'-0"
5'-0"
5'-0"
6'-0"
3'-0"
8'-0"
6'-0"
6'-0"
6'-0"
6'-0"
8'-0"
8'-0"
7'-0"
7'-0"
8'-0"
EPO
3/4" HWS
3/4" HWS/R
3/4" HWR
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
1-1/4" HWS/R
1-1/4" HWS/R
1-1/4" HWS/R
1-1/4" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
1-1/2" HWS/R
2" HWS/R
2" HWS/R
HRV-1
HC-2
1" HWS/R
1" HWS/R
3/4" HWS/R
1-1/4" HWS/R
1-1/4" HWS/R
1-1/4" HWS/R
1" HWS/R
GF
2
P
2
P
1
P
3
P
4
P
5
P
6
P
7
1
3
3
4
5
6
7
8
9
10
9
10
11
11
12
13 3/4" HWS UP TO BB-28.
3/4" HWR DOWN FROM BB-28.
3/4" HWS UP TO BB-24.
3/4" HWS DOWN FROM BB-24.
3/4" HWS UP TO BB-23.
3/4" HWR DOWN FROM BB-23.
3/4" HWS UP TO BB-25.
3/4" HWS DOWN FROM BB-25.
3/4" HWS UP TO BB-22.
3/4" HWR DOWN FROM BB-69.
14
13
14
15
16
17
18
15
16
17
18
19
20
21
22
20
21
22
23 ROUTE ABOVE CEILING.
3/4" HWS/R TO HC-2.
ROUTE 1-1/4" HWS/R FROM HC COILS AND 2" HWS/R FROM BASEBOARDS
TO MAIN BOILER LOOP. RE: BOILER PIPING DIAGRAM ON M1.3
INSTALL B-1 & B-2 PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
ROUTE 3/4" CONDENSATE DRAIN TO THE NEAREST FLOOR DRAIN VIA
NEUTRALIZATION BASIN. TERMINATE VIA AIR GAP. FOR VENTING RE:
M3.0 PLAN
23
23
23
23
23 23
23
23
23
23
23
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3. ALL MECHANICAL PIPING SHOWN DASHED SHALL BE ROUTED TO FLOOR
ABOVE.
4. VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT
ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS
SHOWN ON PLANS.
5. LOCATION OF ALL THERMOSTATS ARE APPROXIMATE, COORDINATE
EXACT LOCATIONS WITH THE ARCHITECT.
6. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY
CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.
7. ALL BASEBOARD LOOPS SHALL BE EQUIPPED WITH A ZONE VALVE
INTERLOCKED WITH THEIR RESPECTIVE WALL MOUNTED T-STATS AND
EQUIPPED WITH ISOLATING VALVES IN THE BASEBOARD ENCLOSURE. ALL
LOOPS AND BASEBOARDS SHALL BE INSTALLED TO ALLOW SAFE
DRAINING.
24
24
BB
20 10'-0"
BB
3
6'-0"
3/4" HWS
BB
21
5'-0"
BB
24
5'-0"
25
25
3/4" HWR
3/4" HWS/R
26
26
26
BB
12
3'-0"
3/4" HWS/R
3/4" HWS/R
T
T
T
T
T
T
T
T
TO BB-14,15
TO BB-13
TO BB-6
TO BB-10
TO BB-1 - 5
T
TO BB-9 - 12
T
TO BB-23,24
TO BB-21,22
TO BB-16 - 20
TO BB-25, 26
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
.'8'.
2+2+0)
2.#0
5%#.' Ä
/
NORTH
LEVEL 1 PIPING PLAN
SCALE: 3/16" = 1'0"
06/14/16