Loading...
HomeMy WebLinkAboutB16-0087_M2.2_1478903654.pdfW D UP DN D E C 5 6 4 1 3 2 7 A B 8 F.1 F.2 F.3 F.4 7.5 A1 4.9 7A 7B 7C DECK DRAIN DECK DRAIN 3rd FLR STORAGE 3rd FLR HALLWAY / STAIRS 3rd FLR BED #1 3rd FLR BED #2 LAUNDRY 3rd FLR BED #3 3rd FLR LIVING 3rd FLR BATH #1 3rd FLR BATH #2 3rd FLR KITCHEN DUTY OFFICE BB 56 BB 57 BB 58 BB 62 BB 61 BB 60 BB 63 BB 64 BB 59 BB 53 BB 55 BB 65 BB 51 BB 52 BB 50 BB 49 BB 54 BB 45 BB 48 SHEET DETAIL NOTES: 3/4" HWS UP TO BB-54. 3/4" HWS DOWN FROM BB-55. 3/4" HWS UP TO BB-56. 3/4" HWR DOWN FROM BB-56. 3/4" HWS UP TO BB-57. 3/4" HWR DOWN FROM BB-57. 3/4" HWS UP TO BB-62. 3/4" HWR DOWN FROM BB-63. 3/4" HWS UP TO BB-58. 3/4" HWR DOWN FROM BB-58. 3/4" HWS UP TO BB-59. 3/4" HWS DOWN FROM BB-59. 3/4" HWS UP TO BB-60. 3/4" HWS DOWN FROM BB-60. 3/4" HWS UP TO BB-61. 3/4" HWR DOWN FROM BB-61. ROUTE ABOVE CEILING. 3/4" HWS/R TO HC-1. 1 2 3 4 2 1 6 5 8 7 10 9 15 11 12 14 2'-0" 2'-0" 3'-0" 2'-0" 2'-0" 2'-0" 7'-0" 6'-0" 5'-0" 5'-0" 6'-0" 4'-0" 4'-0" 4'-0" 5'-0" 5'-0" 4'-0" 4'-0" 4'-0" T 3/4" HWR 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWR 3/4" HWS 3/4" HWS/R 3/4" HWS 3/4" HWS/R 3/4" HWS/R 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWR 3/4" HWS 3/4" HWR 3/4" HWS/R 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS 3/4" HWS/R 1-1/4" HWS/R 3/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R 1-1/4" HWS/R ERV-1 HC-1 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 1" HWS/R 1" HWS/R 3 4 5 6 7 8 9 10 11 12 13 14 15 16 13 16 17 17 17 17 17 17 17 17 17 17 GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3. ALL MECHANICAL PIPING SHOWN DASHED SHALL BE ROUTED TO FLOOR ABOVE. 4. LOCATION OF ALL THERMOSTATS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. 5. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 6. ALL BASEBOARD LOOPS SHALL BE EQUIPPED WITH A ZONE VALVE INTERLOCKED WITH THEIR RESPECTIVE WALL MOUNTED T-STATS AND EQUIPPED WITH ISOLATING VALVES IN THE BASEBOARD ENCLOSURE. ALL LOOPS AND BASEBOARDS SHALL BE INSTALLED TO ALLOW SAFE DRAINING. 3/4" HWS/R UP TO HC-3. 3/4" HWS/R DOWN TO HC-4. 18 18 3/4" HWS BB 46 4'-0" BB 47 2'-0" T T T T T T T T T TO BB-56, 57 TO BB-58, 59 TO BB-61, 62 TO BB-60 TO BB-45 - 52 TO BB-65 TO BB-63 - 64 TO BB-54 TO BB-55 TO BB-44 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  2+2+0) 2.#0 5%#.'   žÄ /   NORTH LEVEL 3 PIPING PLAN SCALE: 3/16" = 1'0" 06/14/16