Loading...
HomeMy WebLinkAboutB16-0087_M2.3_1478901791.pdfW D UP DN D 4 D 3 4 M M D C 5 6 4 1 3 2 7 A B 8 F.3 F.4 7.5 A1 4.9 7B 7C 4th FLR BEDROOM (EHU #1) 4th FLR BED (EHU #1) BATH BB 67 BB 68 BB 66 2'-0" 4'-0" 7'-0" HRV-3 HC-4 3/4" HWS/R GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3. ALL MECHANICAL PIPING SHOWN DASHED SHALL BE ROUTED TO FLOOR ABOVE. 4. LOCATION OF ALL THERMOSTATS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. 5. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 6. ALL BASEBOARD LOOPS SHALL BE EQUIPPED WITH A ZONE VALVE INTERLOCKED WITH THEIR RESPECTIVE WALL MOUNTED T-STATS AND EQUIPPED WITH ISOLATING VALVES IN THE BASEBOARD ENCLOSURE. ALL LOOPS AND BASEBOARDS SHALL BE INSTALLED TO ALLOW SAFE DRAINING. 3/4" HWS/R DOWN TO FLOOR BELOW T TO BB-67-68 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  '*7 .1(6 2+2+0) 2.#0 5%#.'   žÄ /   NORTH LEVEL 4 (EHU LOFT) PIPING PLAN SCALE: 3/16" = 1'0" 06/14/16