HomeMy WebLinkAboutB16-0087_M2.3_1478901791.pdfW
D
UP
DN
D
4
D 3
4
M
M
D C
5
6
4
1
3
2
7
A
B
8
F.3 F.4
7.5
A1
4.9
7B 7C
4th FLR
BEDROOM
(EHU #1)
4th FLR
BED
(EHU #1)
BATH
BB
67
BB
68
BB
66
2'-0"
4'-0"
7'-0"
HRV-3
HC-4
3/4" HWS/R
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3. ALL MECHANICAL PIPING SHOWN DASHED SHALL BE ROUTED TO FLOOR
ABOVE.
4. LOCATION OF ALL THERMOSTATS ARE APPROXIMATE, COORDINATE
EXACT LOCATIONS WITH THE ARCHITECT.
5. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY
CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.
6. ALL BASEBOARD LOOPS SHALL BE EQUIPPED WITH A ZONE VALVE
INTERLOCKED WITH THEIR RESPECTIVE WALL MOUNTED T-STATS AND
EQUIPPED WITH ISOLATING VALVES IN THE BASEBOARD ENCLOSURE. ALL
LOOPS AND BASEBOARDS SHALL BE INSTALLED TO ALLOW SAFE
DRAINING.
3/4" HWS/R DOWN
TO FLOOR BELOW
T
TO BB-67-68
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
.'8'.
'*7 .1(6
2+2+0) 2.#0
5%#.' Ä
/
NORTH
LEVEL 4 (EHU LOFT) PIPING PLAN
SCALE: 3/16" = 1'0"
06/14/16