HomeMy WebLinkAboutB16-0087_P1.0_1478903667.pdfGREASE WASTE BELOW GRADE
INDIRECT WASTE
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
WASTE ABOVE GRADE
DOMESTIC HOT WATER RECIRC.
DOMESTIC HOT WATER
DOMESTIC COLD WATER
PLUMBING LEGEND
MEDIUM PRESSURE NATURAL GAS
GREASE WASTE ABOVE GRADE
WASTE BELOW GRADE
GAS
G
MPG
VENT THROUGH ROOF
CLEAN OUT TO GRADE
FLOOR CLEAN OUT
WALL CLEAN OUT
CLEAN OUT
NEW
EXISTING
CO
WCO
FCO
COTG
(E)
(N)
VTR
IW
VENT
CONDENSATE DRAIN
C
UP THROUGH ROOF
UTR
PIPE RISER
PIPE DROP
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
PIP END CAP
PIPE CONTINUATION
PIPE EXPANSION GUIDE
PIPE UNION
PIPE ANCHOR
FLEXIBLE PIPE CONNECTION
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
AIR VENT
PLUG VALVE
CHECK VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
STRAINER
PRESSURE - TEMP. TAP
PRESSURE GAUGE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
4-WAY CONTROL VALVE
FLOW REGULATOR VALVE
DIFFERENTIAL BYPASS VALVE
NATURAL GAS PRESSURE REGULATOR
THERMOMETER
UP
UP
DOWN
DN
PLUMBING SPECIFICATIONS:
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES
NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL
WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO
MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE
MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT
WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM,
EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED
HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING
INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE
MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER
AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR
RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND
QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS
BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING
CONDITIONS & EXACT NATURE OF THE WORK.
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR
FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW
EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO
THOROUGHLY MAKE THE EXAMINATION.
5. CODES AND PERMITS:
a. ALL PLUMBING EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE
2012 INTERNATIONAL PLUMBING CODE (IPC), 2012 INTERNATIONAL ENERGY
CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE
TOWN OF VAIL BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED
TO THE ARCHITECT.
6. AS-BUILTS:
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS
WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT
AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND
MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND
MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.
8. SUBMITTALS:
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL
BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH).
ELECTRONIC SUBMITTALS PREFERRED.
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO
PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING:
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR
EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X-RAY SLABS PRIOR TO CORING.
11. CLEANUP:
a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR
SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS
INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY.
12. PLUMBING IDENTIFICATION
a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR
PERMANENT ATTACHMENT ON EQUIPMENT.
b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING
SERVICE, AND SHOWING DIRECTION OF FLOW.
c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING
SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME.
PROVIDE 5/32" HOLE FOR FASTENER.
d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED
TO THE MAINTENANCE ENGINEER FOR RECORD.
13. PIPE INSULATION:
a. DOMESTIC WATER PIPING INSULATION SHALL HAVE A THERMAL
CONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-F.
b. HOT & COLD WATER SUPPLY PIPING (EXCEPT RUN OUTS 12 FT. OR SHORTER
TO INDIVIDUAL FIXTURES) SHALL BE INSULATED AS FOLLOWS:
PIPE SIZE (IN.) INSULATION THICKNESS (IN.)
1/2", 3/4" & 1" 1"
1 1/4" THROUGH 6" 1 1/2"
c. NO HOT OR COLD WATER PIPING SHALL BE ROUTED IN EXTERIOR WALLS
UNLESS PROPERLY INSULATED.
d. CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC.
e. STORM DRAIN PIPING SHALL BE INSULATED WITH FIBERGLASS INSULATION
FROM THE UNDERSIDE OF THE DECK TO THE VERTICAL RISER.
14. PIPING:
a. WASTE, VENT AND STORM DRAIN PIPING:
i. SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE.
ii. UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC.
iii. VENT PIPING IN RETURN AIR CEILING PLENUMS SHALL BE COPPER PIPING.
b. WATER PIPING:
i. SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER
FITTINGS.
ii. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER.
iii. :$7(5 3,3,1* ´ 60$//(5 &$1 $/62 %( 832125 $48$3(; $35
REHAU RAUPEX OR EQUIVILANT-PROVIDE DEDUCT ALTERNATE PRICING.
iv. UNLESS OTHERWISE NOTED, ALL WATER PIPE SIZING IS BASED UPON
COPPER. IF ASTM APPROVED PEX IS UTILIZED, UPSIZE ONE NOMINAL SIZE
FROM THAT SHOWN ON PLANS.
c. CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS.
d. NATURAL GAS PIPING:
i. 2" AND SMALLER SHALL BE THREADED STANDARD WEIGHT SCHEDULE 40
BLACK STEEL PIPE WITH SCREWED MALLEABLE IRON FITTINGS.
ii. PIPING 2 1/2" AND LARGER SHALL BE WELDED.
iii. CSST PIPE IS NOT APPROVED.
iv. ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR ENAMEL.
v. REGULATOR VENTING SHALL BE NO LONGER THAN MANUFACTURER'S
RECOMMENDATION, ALUMINUM, VENTED TO THE OUTDOORS, AND A MINIMUM
OF 3' FROM ANY OPENING INTO BUILDING AND 6' FROM ANY MECHANICAL
INTAKE AND 1' FROM ANY ELECTRICAL EQUIPMENT.
e. UNDERGROUND NATURAL GAS PIPING:
i. SHALL BE IPS SDR 10 TUBING WHICH MEETS ASTM D2513 MANUFACTURED BY
UPONOR OR IAPMO.
ii. ANY GAS PIPING ROUTED BENEATH HARD POURED SURFACES SHALL BE
SLEEVED TO MEET THE REQUIREMENTS OF THE UTLITY COMPANY, XCEL
ENERGY.
15. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM ANY
MECHANICAL INTAKE AND AT LEAST THREE FEET FROM ANY OPENING INTO THE
BUILDING.
16. VERIFY INVERT ELEVATION OF WASTE LINE IN STREET PRIOR TO ROUTING ANY
PIPING. PROVIDE SEWAGE WASTE EJECTOR IF I.E. OF EXISTING SANITARY WASTE
CAN NOT BE ACCOMMODATED.
17. CLEAN-OUTS SHALL BE INSTALLED AS PER 2012 IPC SECTION 708.
18.
3527(&7 522) 5(&(3725 21 522) )520 5$,1 :$7(5 %< (/(9$7,1* 7+( 5,0 ò´
INCHES ABOVE ROOF SURFACE.
19. PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS,
ROOF AND FLOORS.
20. PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE-STOPPED.
FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND
CAPABLE OF MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO TEST TEMPERATURE
FOR SPECIFIC WALL OR PARTITION.
21. PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALL
PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT
WITH ANY PORTION OF THE STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING.
22. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY
EXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS
SECTION. MAKE REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IF
INDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THE
CONTRACTOR SHALL, BEFORE CONTINUING, NOTIFY THE ARCHITECT PRIOR TO
INSTALLING ANY WORK WHICH MAY BE AFFECTED.
23. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR
INSTALLING THE WORK.
24. VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICE
PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED.
25. PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN THE
2012 IPC SECTION 308. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.
26. CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRING
ROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE AND
OPERATING MANUALS TO THE OWNER/OPERATOR.
27. CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITY
CONNECTIONS.
28. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO
THE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE SECURED 6"
OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET BRACKETS.
29. AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAM
OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCE
OF CONTAMINATION.
30. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS SHALL BE
PROVIDED BY THE PLUMBING CONTRACTOR AND WIRED BY THE ELECTRICAL
CONTRACTOR.
STORM DRAIN
SD
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
2.7/$+0)
.')'0&
52'%5
5%*'&7.'5
2
06/14/16