HomeMy WebLinkAboutB16-0087_P2.1_1478903673.pdfDN
D E C
5
6
4
1
3
2
7
A
B
8
F.1 F.2
F.3F.4
7.5
A1
4.9
7A
7B
7C
EHU #2 STORAGE
EHU #2 BED - BATH
EHU #2 BED
EHU #2 LIVING
EHU CORRIDOR
EHU #1 BED
EHU #1 BED - BATH
EHU #1 LIVING
EHU #1 KITCHEN
2ND FLR HALLWAY /
STAIRS
VOID SPACE
LV-1
WC-1
BT-1
LV-1 WC-1
BT-1
1
1
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3. INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIRED
CLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONS
WITH THE ARCHITECT PRIOR TO INSTALLATION.
CONNECT 1-1/2" W & 1-1/2" V TO LV-1. ROUTE 1-1/2" W
TO WC-1 OR BT-1 WASTE LINE & PENETRATE TO
FLOOR BELOW.
CONNECT 3" W & 2" V TO WC-1.
CONNECT 2" W & 1-1/2" V TO BT-1.
CONNECT 3" W TO WC-1 ABOVE.
ROUTE 4" W ALONG COLUMN TO FLOOR BELOW.
3" SD UP TO DD-1 ABOVE.
2" W UP TO KS-1 ABOVE.
3" W UP TO FLOOR ABOVE.
2" W UP TO SH-1 ABOVE.
SHEET DETAIL NOTES:
1
2
2
2
3
3
3
2" W
4
4
2" W
2" W
3" W
3" W
2" W
3" W
3" W
3" W
4" W
5
5
3" W
3" W
2" W
3" V TO UP &
DOWN TO
FLOOR ABOVE
3" VTR
3" V UP
1-1/2" V
2" V
SCUPPER
3" SD
3" SD
3" DOWN TO 6"
MAIN
6
6
6
1-1/4" V
1-1/4" V
3" VTR
7
7
8
8
9
9
8
9
8
9
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
.'8'.
9#56'
8'06 2.#0
5%#.' Ä
2
NORTH
LEVEL
2 WASTE
& VENT
PLAN
SCALE: 3/16" = 1'0"
06/14/16