Loading...
HomeMy WebLinkAboutB16-0087_P2.1_1478903673.pdfDN D E C 5 6 4 1 3 2 7 A B 8 F.1 F.2 F.3F.4 7.5 A1 4.9 7A 7B 7C EHU #2 STORAGE EHU #2 BED - BATH EHU #2 BED EHU #2 LIVING EHU CORRIDOR EHU #1 BED EHU #1 BED - BATH EHU #1 LIVING EHU #1 KITCHEN 2ND FLR HALLWAY / STAIRS VOID SPACE LV-1 WC-1 BT-1 LV-1 WC-1 BT-1 1 1 GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3. INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIRED CLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONS WITH THE ARCHITECT PRIOR TO INSTALLATION. CONNECT 1-1/2" W & 1-1/2" V TO LV-1. ROUTE 1-1/2" W TO WC-1 OR BT-1 WASTE LINE & PENETRATE TO FLOOR BELOW. CONNECT 3" W & 2" V TO WC-1. CONNECT 2" W & 1-1/2" V TO BT-1. CONNECT 3" W TO WC-1 ABOVE. ROUTE 4" W ALONG COLUMN TO FLOOR BELOW. 3" SD UP TO DD-1 ABOVE. 2" W UP TO KS-1 ABOVE. 3" W UP TO FLOOR ABOVE. 2" W UP TO SH-1 ABOVE. SHEET DETAIL NOTES: 1 2 2 2 3 3 3 2" W 4 4 2" W 2" W 3" W 3" W 2" W 3" W 3" W 3" W 4" W 5 5 3" W 3" W 2" W 3" V TO UP & DOWN TO FLOOR ABOVE 3" VTR 3" V UP 1-1/2" V 2" V SCUPPER 3" SD 3" SD 3" DOWN TO 6" MAIN 6 6 6 1-1/4" V 1-1/4" V 3" VTR 7 7 8 8 9 9 8 9 8 9 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  9#56'  8'06 2.#0 5%#.'   žÄ 2   NORTH LEVEL 2 WASTE & VENT PLAN SCALE: 3/16" = 1'0" 06/14/16