HomeMy WebLinkAboutB16-0087_P2.4_1465941600.pdfDN
D E C
5
6
4
3
2
B
F.1
F.3 F.4
7.5
4.9
7B 7C
LEVEL 5 STAIRS /
HALLWAY
LEVEL 5 OFFICE LEVEL 5
BEDROOM
LEVEL 5 BATH
SH-1
WC-1
LV-1
1
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3. INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIRED
CLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONS
WITH THE ARCHITECT PRIOR TO INSTALLATION.
CONNECT 1-1/2" W & 1-1/2" V TO LV-1. ROUTE 1-1/2" W TO
WC-1 WASTE LINE & PENETRATE TO FLOOR BELOW.
CONNECT 3" W & 2" V TO WC-1. ROUTE & PENETRATE 3"
W TO FLOOR BELOW.
CONNECT 2" W & 1-1/2" V TO SH-1.
SHEET DETAIL NOTES:
1
2
2
3
3
1-1/2" W
3" VTR
3" VTR
3" VTR
3" V
1-1/2" V
2" V
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
.'8'.
'*7 .1(6
9#56'
8'06 2.#0
5%#.' Ä
2
NORTH
LEVEL 5 (EHU LOFT) WASTE & VENT PLAN
SCALE: 3/16" = 1'0"
06/14/16