Loading...
HomeMy WebLinkAboutB16-0087_P2.6_1465941600.pdfDN D E C 5 6 4 1 3 2 7 A B 8 F.1 F.2 F.3 F.4 7.5 A1 4.9 7A 7B 7C EHU #2 STORAGE EHU #2 BED - BATH EHU #2 BED EHU #2 LIVING EHU CORRIDOR EHU #1 BED EHU #1 BED - BATH EHU #1 LIVING EHU #1 KITCHEN 2ND FLR HALLWAY / STAIRS VOID SPACE LV-1 WC-1 BT-1 LV-1 WC-1 BT-1 GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 1/2" HWC UP & DOWN 1-1/4" HW 1-1/2" CW 3/4" HW 3/4" CW 3/4" HW 3/4" CW 3/4" HW 3/4" CW 3/4" HW 1" CW 3/4" HW 1" CW CONNECT 1/2" CW & 1/2" HW TO LV-1. CONNECT 1/2" CW TO WC-1. CONNECT 3/4" CW & 3/4" HW TO BT-1. PROVIDE FURR-OUT WALL IN THIS AREA TO AVOID ROUTING PLUMBING PIPING IN THE EXTERIOR WALL TO PREVENT FREEZING. COORDINATE WITH ARCHITECT IN FIELD. SHEET DETAIL NOTES: 1 2 3 1 1 2 2 3 3 1/2" HW & CW 3/4" HW & CW 1/2" CW 4 4 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  &*9  )#5 2.#0 5%#.'   žÄ 2   NORTH LEVEL 2 DHW & GAS PLAN SCALE: 3/16" = 1'0" 06/14/16