HomeMy WebLinkAboutB16-0087_P2.8_1465941600.pdfW
D
UP
DN
D
4
D 3
4
M
M
D C
5
6
4
1
3
2
7
A
B
8
F.3 F.4
7.5
A1
4.9
7B 7C
4th FLR
BEDROOM
(EHU #1)
4th FLR
BED
(EHU #1)
BATH
LV-1
WC-1
SH-1
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
CONNECT 1/2" CW & 1/2" HW TO LV-1.
CONNECT 1/2" CW TO WC-1.
CONNECT 3/4" CW & 3/4" HW TO SH-1.
3/4" HW, CW 7 1/2" HWC SEE P3.2 FOR CONTINUATION.
PROVIDE FURR-OUT WALL IN THIS AREA TO AVOID
ROUTING PLUMBING PIPING IN THE EXTERIOR WALL
TO PREVENT FREEZING. COORDINATE WITH
ARCHITECT IN FIELD.
SHEET DETAIL NOTES:
1
2
3
1
2
3
4
4
1/2" HWC
3/4" HW
3/4" CW
RECIRC
BALANCING
VALVE
5
5
of
Drawn By: Checked By:
DATE: ISSUE:
02-22-16 DD SET
AEC PROJECT #: TOV FIRE STATION #1
RENOVATION
VAIL, COLORADO 81657
16001.00
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
03-14-16
PROGRESS
03-22-16
PERMIT
04-01-16
CD SET
') 61%
.'8'.
'*7 .1(6
&*9 )#5
5%#.' Ä
2
NORTH
LEVEL 4 (EHU LOFT) DHW & GAS PLAN
SCALE: 3/16" = 1'0"
06/14/16