Loading...
HomeMy WebLinkAboutB16-0087_P2.8_1478901821.pdfW D UP DN D 4 D 3 4 M M D C 5 6 4 1 3 2 7 A B 8 F.3 F.4 7.5 A1 4.9 7B 7C 4th FLR BEDROOM (EHU #1) 4th FLR BED (EHU #1) BATH LV-1 WC-1 SH-1 GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. CONNECT 1/2" CW & 1/2" HW TO LV-1. CONNECT 1/2" CW TO WC-1. CONNECT 3/4" CW & 3/4" HW TO SH-1. 3/4" HW, CW 7 1/2" HWC SEE P3.2 FOR CONTINUATION. PROVIDE FURR-OUT WALL IN THIS AREA TO AVOID ROUTING PLUMBING PIPING IN THE EXTERIOR WALL TO PREVENT FREEZING. COORDINATE WITH ARCHITECT IN FIELD. SHEET DETAIL NOTES: 1 2 3 1 2 3 4 4 1/2" HWC 3/4" HW 3/4" CW RECIRC BALANCING VALVE 5 5 of Drawn By: Checked By: DATE: ISSUE: 02-22-16 DD SET AEC PROJECT #: TOV FIRE STATION #1 RENOVATION VAIL, COLORADO 81657 16001.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 E G$Q 2IILFH ZLWK /(('Œ $FFUHGLWHG 3URIHVVLRQDOV 03-14-16 PROGRESS 03-22-16 PERMIT 04-01-16 CD SET ') 61% .'8'.  '*7 .1(6 &*9  )#5 5%#.'   žÄ 2   NORTH LEVEL 4 (EHU LOFT) DHW & GAS PLAN SCALE: 3/16" = 1'0" 06/14/16