HomeMy WebLinkAboutB17-0081_L3 BDR_1494884400.pdf80.2'
(79.4')
(79.4')
91.44'
93.0'
(77.2')
(77.2')
78.0'
80.18'
81.5'
93.5'
95.0'
4.0'
5.0'
88.5'
97.0'
5.5'
85.0'
94.0'
93.0'
99.5'
91.0'
5.5'
99.5'
2.0'
Eave Ht.
El. 8214'-5 1/2"
Eave Ht.
El. 8214'-0 1/4"
Eave Ht.
El. 8219'-0 5/8"
Eave Ht.
El. 8214'-4 1/4"
Roof Ht.
El. 8235'-2"
Eave Ht.
El. 8226'-3 3/4"
Eave Ht.
El. 8219'-9 1/2"
3'-3"
Eave Ht.
El. 8219'-10"
3'-3"
3'-6"
1'-6"
3'-6"3'-6"
3'-6"
3'-6"
3'
-6"
2'-6"
2'-6"
2'-6"
3'-6"
3'-6"
2'-0"
2'-0"
3'-3"
2'-0"
1'-0"
3'-6"5 1/2"3'-6"
Eave Ht.
El. 8209'-10 3/4"
Eave Ht.
El. 8217'-2 7/8"
3'-6"
100.0'
93.5'
5.5'
5.5'
5.0'
93.0'
96.5'
98.0'
98.5'
99.5'
1.0'
2.5'
5.25'
5.2'
5.25'
5.25'
H.P.
8.5'
5.38'
3.5'
4.7'
5.25'
4.7'
3'-6"
Eave Ht.
El. 8234'-1 3/4"
El. 8226'-1 1/8"
Eave Ht.
81.16'
81.25'
83.42'
Landing
81.33'
90.0'
87.0'
93.4'
107.9
6.7
2506.8
1613.5 53.5 62.4
28.0
7223
4620.5
99.2
59.1
48.0
214.5
52.6
87.7
38
822.8
86.7
27
27
57.0
Hardscape
Softscape
Site Calculations:
Total Lot area: 22,651 s.f.
Site Coverage:
Building 4,493 s.f.
Softscape 12,285 s.f.
Landscape = 60% site min. = 13,590.6 s.f.
Softscape (80% landscape): = 10,872.5 s.f.
Hardscape 1,383 s.f.
20% landscape maximum = 2,718.1
Patios and Walks = 1,383 (50.8% of max.)
Driveways (2,312 + 1,503) = 4,120
P.O. Box 1871 Avon
Colorado
81620
(970)
390-6550 ric@fieldscape.net
c
Issue Date
Sheet:
Of: eight
L3
Roof Height
Calculation and Site Coverage
Calculation
The Beaver
Dam
Residences
Lot 9, Block 2, Vail Village
Filing 3, 354 Beaver
Dam
Road,
Vail,
Colorado Copyright
Fieldscape Incorporated
All Rights Reserved
This document, and the ideas and
designs incorporated herein, as an
instrument of professional service, is
the property of Fieldscape
Incorporated and is not to be used,
in whole or in part, for any other
project without the written
authorization of Ric Fields
Scale: 1"=10'-0"
North
Roof Height Calculation Plan
T.O.V. Conceptual
June 20, '16
Review
DRB Presentation
July 20, '16
Scale: 1"=10'-0"
North
Site Coverage Calculation
T.O.V. Aug. 11, '16
T.O.V. Final Review Aug. 29, '16
T.O.V. Comments
Sept. 9, '16
Mar. 1, '17
TOV DRB
Revisions
TOV Building
Permit
Mar. 31, '17
05/15/17