Loading...
HomeMy WebLinkAboutB17-0082_L3 BDR_1494885120.pdf80.2' (79.4') (79.4') 91.44' 93.0' (77.2') (77.2') 78.0' 80.18' 81.5' 93.5' 95.0' 4.0' 5.0' 88.5' 97.0' 5.5' 85.0' 94.0' 93.0' 99.5' 91.0' 5.5' 99.5' 2.0' Eave Ht. El. 8214'-5 1/2" Eave Ht. El. 8214'-0 1/4" Eave Ht. El. 8219'-0 5/8" Eave Ht. El. 8214'-4 1/4" Roof Ht. El. 8235'-2" Eave Ht. El. 8226'-3 3/4" Eave Ht. El. 8219'-9 1/2" 3'-3" Eave Ht. El. 8219'-10" 3'-3" 3'-6" 1'-6" 3'-6"3'-6" 3'-6" 3'-6" 3' -6" 2'-6" 2'-6" 2'-6" 3'-6" 3'-6" 2'-0" 2'-0" 3'-3" 2'-0" 1'-0" 3'-6"5 1/2"3'-6" Eave Ht. El. 8209'-10 3/4" Eave Ht. El. 8217'-2 7/8" 3'-6" 100.0' 93.5' 5.5' 5.5' 5.0' 93.0' 96.5' 98.0' 98.5' 99.5' 1.0' 2.5' 5.25' 5.2' 5.25' 5.25' H.P. 8.5' 5.38' 3.5' 4.7' 5.25' 4.7' 3'-6" Eave Ht. El. 8234'-1 3/4" El. 8226'-1 1/8" Eave Ht. 81.16' 81.25' 83.42' Landing 81.33' 90.0' 87.0' 93.4' 107.9 6.7 2506.8 1613.5 53.5 62.4 28.0 7223 4620.5 99.2 59.1 48.0 214.5 52.6 87.7 38 822.8 86.7 27 27 57.0 Hardscape Softscape Site Calculations: Total Lot area: 22,651 s.f. Site Coverage: Building 4,493 s.f. Softscape 12,285 s.f. Landscape = 60% site min. = 13,590.6 s.f. Softscape (80% landscape): = 10,872.5 s.f. Hardscape 1,383 s.f. 20% landscape maximum = 2,718.1 Patios and Walks = 1,383 (50.8% of max.) Driveways (2,312 + 1,503) = 4,120 P.O. Box 1871 Avon Colorado 81620 (970) 390-6550 ric@fieldscape.net c Issue Date Sheet: Of: eight L3 Roof Height Calculation and Site Coverage Calculation The Beaver Dam Residences Lot 9, Block 2, Vail Village Filing 3, 354 Beaver Dam Road, Vail, Colorado Copyright Fieldscape Incorporated All Rights Reserved This document, and the ideas and designs incorporated herein, as an instrument of professional service, is the property of Fieldscape Incorporated and is not to be used, in whole or in part, for any other project without the written authorization of Ric Fields Scale: 1"=10'-0" North Roof Height Calculation Plan T.O.V. Conceptual June 20, '16 Review DRB Presentation July 20, '16 Scale: 1"=10'-0" North Site Coverage Calculation T.O.V. Aug. 11, '16 T.O.V. Final Review Aug. 29, '16 T.O.V. Comments Sept. 9, '16 Mar. 1, '17 TOV DRB Revisions TOV Building Permit Mar. 31, '17 05/15/17