HomeMy WebLinkAboutB17-0098_A3.2_1493330220.pdfPHASE 2C
REMOVE FLAGSTONE
NEW 4" STONE PATIO ASSEMBLY: 1 1/2" FLAGSTONE
OVER 1" GROUT BED OVER 1 1/2" TOPPING SLAB W/
NEW SNOW MELT TUBING. SEE SITE PLAN A2.0 FOR
EXTENT OF PHASE 2C. SNOW MELT WALKWAY
EXTENDS TO 64 BEAVER DAM. SNOW MELT
WALKWAY FOR BOTH PROPERTIES TO BE RAN ON 84
BEAVER DAM BOILER
NEW
NEW
GENERAL NOTES:
1.) ALL DIMENSIONS FROM EXISTING HOUSE DRAWINGS VERIFY IN FIELD
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date 3/28/2017 3:15:50 PM
1/4" = 1'-0"
84 BEAVER DAM REMODEL
VAIL, CO
A3.2
MAIN
LEVEL
FLOOR
PLAN
3-28-2017
CPM
HB
3-28-2017
PROGRESS SET
0' 2' 4' 8' 16'
1/4" = 1'-0"
1
EXISTING MAIN LEVEL FLOOR PLAN
REVISION SCHEDULE
# DESCRIPTION DATE
04/27/17