Loading...
HomeMy WebLinkAboutB17-0130_A3.2_1496783940.pdfWP 3 GFI +42 A3.2 4 2 3 5 3' - 3" 4' - 11" 3' - 3 3/4" 5' - 10 3/4" 8' - 0" .3'-0" 2' - 1" 4" 1' - 0 1/2" 8' - 0" 7' - 0" 4' - 11 1/2" 3RD FLOOR STEP 8194' - 2" 8' - 0" 8' - 0" F E A3.2 7 8 9 10 5' - 0 1/2" 10' - 0" 10' - 0" 7' - 0" 10' - 0" 3' - 0" 4" 2' - 3" PLAN NORTH TRUE NORTH 1650 Fallridge Road, Suite C-1 Vail, Colorado 81657 f.(970) 476-4901 p.(970)476-6342 LOT 15 BIGHORN SUBDIVISION 291 BRIDGE ST, UNIT R-1 VAIL, CO 81657 A3.2 ENLARGED PLANS 3RD FLR BATHROOMS PLAZA LODGE R-1 Project Number - 1547 04/20/17 PERMIT SET 1/2" = 1'-0" 1 ENLARGED PLAN MASTER BATH 1/2" = 1'-0" 2 MASTER BATH - ELEVATION 2 1/2" = 1'-0" 3 MASTER BATH - ELEVATION 3 1/2" = 1'-0" 4 MASTER BATH - ELEVATION 4 1. PROTECT ALL EXISTING BUILDING COMPONENTS (WALLS, DOORS, WINDOWS, CEILINGS, ETC.) NOTED TO REMAIN DURING DEMOLITION & NEW CONSTRUCTION. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. GENERAL NOTES KEY NOTES 1. PROVIDE NEW LAVATORY AND FAUCETS. RE: MECH / PLMBG. DWGS. 2. PROVIDE NEW SHOWER & CONTROLS. RE: MECH / PLMBG. DWGS. 3. PROVIDE NEW WALL-MOUNTED BASE CABINETS. 4. PROVIDE NEW ELECTRICAL OUTLETS INCLUDING GFI RECEPTACLES AS REQUIRED BY CODE. 5. PROVIDE NEW FULL-HEIGHT TILE. RE: A10.1 ROOM FINISH SCHEDULE. 6. PROVIDE NEW CLEAR FLOAT GLASS MIRROR FROM TOP OF COUNTER TO 7'-0" A.F.F. 7. PROVIDE GLASS SHOWER ENCLOSURE WITH GLASS TYPE AS REQUIRED BY BUILDING CODE. PROVIDE SHOP DRAWINGS FOR REVIEW PRIOR TO INSTALLATION. 8. PROVIDE SHOWER SEAT COVERED WITH TYPICAL WALL TILE. 9. PROVIDE NEW WATER CLOSET. RE: MECH / PLMBG. DWGS. 10. PROVIDE NEW TOILET PAPER HOLDER. 11. PROVIDE NEW DOOR & FRAME. RE: A8.1 DOOR SCHEDULE. 12. PROVIDE NEW CERAMIC TILE BASE. RE: A10.1 ROOM FINISH SCHEDULE. 13. PROVIDE FIRE-RETARDANT TREATED WOOD BLOCKING IN WALLS AS REQUIRED FOR SUPPORT OF ALL TOWEL RACKS AND GRAB BARS. VERIFY & COORDINATE LOCATION OF RACKS WITH OWNER. 1 1/2" = 1'-0" 5 MASTER BATH - ELEVATION 5 1 4 4 2 8 7 9 10 6 5 5 5 3 6 1 5 11 11 11 11 12 13 8 5 7 1 3 6 7 1/2" = 1'-0" 6 ENLARGED PLAN 3RD FLOOR BATH 1 1/2" = 1'-0" 7 3RD FLR BATH 2 - ELEVATION 7 1/2" = 1'-0" 8 3RD FLR BATH 2 - ELEVATION 8 1/2" = 1'-0" 9 3RD FLR BATH 2 - ELEVATION 9 1/2" = 1'-0" 10 3RD FLR BATH 2 - ELEVATION 10 5 5 2 1 8 13 11 7 7 7 2 3 9 6 8 9 3 6 8 9 2 12 5 11 06/06/17