Loading...
HomeMy WebLinkAboutB17-0154_M2.3_1497476280.pdfT T S-1 150 S-1 150 S-1 150 S-1 150 S-1 75 S-1 75 SUPPLY 150 CFM RETURN SUPPLY 350 CFM SUPPLY 350 CFM RETURN RETURN R-1 R-1 R-1 1 1 1 2 3 4 VAIL CASCADE + ARIA RENOVATION 1300 WESTHAVEN DRIVE Vail, Colorado 04/20/2017 Revisions: Sheet Title: Project No: Sheet No: Issue Dates: (970) 748-1470 email: tab@vail.net fax: (970) 748-1471 Avon, CO 81620-7431 Post Office Box 7431 TAB The Architectural Balance Associates www.tabassociates.com Plotted: 4/19/2017 6:05:10 PM P:\DAL\BET\TABCO001\CAD\SHEETS\MECHANICAL\M2.3 MECHANICAL FLOOR PLAN - ARIA B.O.H..DWG - snahas A member company of SH Group, Inc. R Syska Hennessy Group, Inc. 1130 E. Arapaho Road Suite #525 Richardson, TX 75081 Tel: 972.470.0704 Fax: 972.470.5851 www.syska.com M2.3 1. RELOCATED AIR TERMINAL. CLEAN AND INSTALL IN NEW LOCATION AS SHOWN PLANS. CONNECT BACK TO MAIN SUPPLY DUCTWORK. BALANCE DIFFUSER TO CFM AS SHOWN ON PLANS (TYP.). 2. RELOCATED WALL-MOUNTED THERMOSTAT. RE-WIRE BACK TO EXISTING HVAC UNIT. 3. NEW SUPPLY AIR TERMINAL. CONNECT TO EXISTING MAIN SUPPLY DUCT. BALANCE SUPPLY DIFFUSERS TO CFM AS SHOWN ON PLANS (TYP.). 4. NEW NON-DUCTED RETURN AIR TERMINAL (TYP.). 1. REFER TO M0.1 FOR CONSTRUCTION NOTES. 06/14/17