HomeMy WebLinkAboutB17-0154_M2.3_1497476280.pdfT
T
S-1
150
S-1
150
S-1
150
S-1
150
S-1
75
S-1
75
SUPPLY
150 CFM
RETURN
SUPPLY
350 CFM
SUPPLY
350 CFM
RETURN
RETURN
R-1
R-1
R-1
1
1
1
2
3
4 VAIL
CASCADE + ARIA
RENOVATION
1300
WESTHAVEN
DRIVE
Vail, Colorado
04/20/2017
Revisions:
Sheet Title:
Project No:
Sheet No:
Issue Dates:
(970) 748-1470
email: tab@vail.net
fax: (970) 748-1471
Avon, CO 81620-7431
Post Office Box 7431
TAB
The Architectural Balance
Associates
www.tabassociates.com
Plotted:
4/19/2017
6:05:10 PM P:\DAL\BET\TABCO001\CAD\SHEETS\MECHANICAL\M2.3
MECHANICAL
FLOOR
PLAN - ARIA
B.O.H..DWG - snahas
A member company of SH Group, Inc.
R
Syska Hennessy Group, Inc.
1130 E. Arapaho Road
Suite #525
Richardson, TX 75081
Tel: 972.470.0704
Fax: 972.470.5851
www.syska.com
M2.3
1. RELOCATED AIR TERMINAL. CLEAN AND INSTALL IN NEW LOCATION AS SHOWN
PLANS. CONNECT BACK TO MAIN SUPPLY DUCTWORK. BALANCE DIFFUSER TO CFM
AS SHOWN ON PLANS (TYP.).
2. RELOCATED WALL-MOUNTED THERMOSTAT. RE-WIRE BACK TO EXISTING HVAC UNIT.
3. NEW SUPPLY AIR TERMINAL. CONNECT TO EXISTING MAIN SUPPLY DUCT. BALANCE
SUPPLY DIFFUSERS TO CFM AS SHOWN ON PLANS (TYP.).
4. NEW NON-DUCTED RETURN AIR TERMINAL (TYP.).
1. REFER TO M0.1 FOR CONSTRUCTION NOTES.
06/14/17