Loading...
HomeMy WebLinkAboutB17-0154_P2.1_1497477794.pdf1 1 1 1 1 1 1 1 4 4 4 2 2 2 2 2 2 2 3 3 3 3 PLUMB NEW FLOOR PLAN - B.O.H. P2.1 VAIL CASCADE + ARIA RENOVATION 1300 WESTHAVEN DRIVE Vail, Colorado 04/20/2017 Revisions: Sheet Title: Project No: Sheet No: Issue Dates: (970) 748-1470 email: tab@vail.net fax: (970) 748-1471 Avon, CO 81620-7431 Post Office Box 7431 TAB The Architectural Balance Associates www.tabassociates.com Plotted: 4/19/2017 6:12:48 PM P:\DAL\BET\TABCO001\CAD\SHEETS\PLUMBING\P2.1 PLUMBING NEW FLOOR PLAN - BACK OF HOUSE.DWG - snahas A member company of SH Group, Inc. R Syska Hennessy Group, Inc. 1130 E. Arapaho Road Suite #525 Richardson, TX 75081 Tel: 972.470.0704 Fax: 972.470.5851 www.syska.com 1. REFER TO P0.1 FOR CONSTRUCTION NOTES. 2. IN RENOVATED AREAS, MODIFY/EXTEND/INSTALL NEW SPRINKLER PIPING AND SPRINKLER HEADS FOR NEW SPACING REQUIREMENTS. 1. INSTALL NEW LAV(S), AND CONNECT TO EXISTING HW, CW, WASTE AND VENT IN WALL. 2. REINSTALL EXISTING WATER CLOSET(S) WITH NEW SEAT AND F.V. CONNECT TO EXISTING CW, WASTE AND VENT IN WALL. 3. INSTALL NEW SHOWER(S) AND CONNECT TO EXISTING HW, CW, WASTE AND VENT IN WALL. 4. REINSTALL EXISTING URINAL(S) WITH NEW F.V. CONNECT TO EXISTING CW, WASTE AND VENT IN WALL. 5. INSTALL WATER CLOSET AND EXTEND AND CONNECT NEW PIPING TO EXISTING CW, WASTE AND VENT IN CHASE FROM DEMO'D WATER CLOSETS - VERIFY 06/14/17