HomeMy WebLinkAboutB17-0154_P2.1_1497477794.pdf1
1
1
1
1
1 1 1
4 4 4
2 2
2 2 2 2
2
3
3
3
3
PLUMB
NEW
FLOOR
PLAN -
B.O.H.
P2.1
VAIL
CASCADE + ARIA
RENOVATION
1300
WESTHAVEN
DRIVE
Vail, Colorado
04/20/2017
Revisions:
Sheet Title:
Project No:
Sheet No:
Issue Dates:
(970) 748-1470
email: tab@vail.net
fax: (970) 748-1471
Avon, CO 81620-7431
Post Office Box 7431
TAB
The Architectural Balance
Associates
www.tabassociates.com
Plotted:
4/19/2017
6:12:48 PM P:\DAL\BET\TABCO001\CAD\SHEETS\PLUMBING\P2.1
PLUMBING
NEW
FLOOR
PLAN - BACK OF HOUSE.DWG - snahas
A member company of SH Group, Inc.
R
Syska Hennessy Group, Inc.
1130 E. Arapaho Road
Suite #525
Richardson, TX 75081
Tel: 972.470.0704
Fax: 972.470.5851
www.syska.com
1. REFER TO P0.1 FOR CONSTRUCTION NOTES.
2. IN RENOVATED AREAS, MODIFY/EXTEND/INSTALL NEW SPRINKLER PIPING AND
SPRINKLER HEADS FOR NEW SPACING REQUIREMENTS.
1. INSTALL NEW LAV(S), AND CONNECT TO EXISTING HW, CW, WASTE AND VENT
IN WALL.
2. REINSTALL EXISTING WATER CLOSET(S) WITH NEW SEAT AND F.V. CONNECT
TO EXISTING CW, WASTE AND VENT IN WALL.
3. INSTALL NEW SHOWER(S) AND CONNECT TO EXISTING HW, CW, WASTE AND
VENT IN WALL.
4. REINSTALL EXISTING URINAL(S) WITH NEW F.V. CONNECT TO EXISTING CW,
WASTE AND VENT IN WALL.
5. INSTALL WATER CLOSET AND EXTEND AND CONNECT NEW PIPING TO EXISTING
CW, WASTE AND VENT IN CHASE FROM DEMO'D WATER CLOSETS - VERIFY
06/14/17