HomeMy WebLinkAboutB17-0154_P2.3_1497477794.pdf1
1/2 "
2
2" V
SK-1
2" SAN
DESIGN DEVELOPMENT /
PROGRESS
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF DESIGN
DEVELOPMENT AND PROGRESS
UNDER THE AUTHORITY OF
JEFFREY W. MUSSER, PE #95820
ON MARCH 31, 2017. IT IS NOT TO
BE USED FOR OTHER PURPOSES.
VAIL
CASCADE + ARIA
RENOVATION
1300
WESTHAVEN
DRIVE
Vail, Colorado
04/20/2017
Revisions:
Sheet Title:
Project No:
Sheet No:
Issue Dates:
(970) 748-1470
email: tab@vail.net
fax: (970) 748-1471
Avon, CO 81620-7431
Post Office Box 7431
TAB
The Architectural Balance
Associates
www.tabassociates.com
Plotted:
4/19/2017
6:14:11 PM P:\DAL\BET\TABCO001\CAD\SHEETS\PLUMBING\P2.3
PLUMBING
NEW
FLOOR
PLAN - ARIA
BACK OF HOUSE.DWG - snahas
A member company of SH Group, Inc.
R
Syska Hennessy Group, Inc.
1130 E. Arapaho Road
Suite #525
Richardson, TX 75081
Tel: 972.470.0704
Fax: 972.470.5851
www.syska.com
PLUMB
NEW
FLOOR
PLAN -
ARIA
B.O.H.
P2.3
1. INSTALL NEW SINK AND EXTEND AND CONNECT NEW 1/2" H & CW, 2" WASTE &
VENT PIPING TO EXISTING HW, CW, WASTE AND VENT AT NEAREST POINT.
BRANCH 1/2" CW TO ICE MAKER
2. CONNECT TO EXISTING PIPING FROM DEMO'D TOILET
1. REFER TO P0.1 FOR CONSTRUCTION NOTES.
2. IN RENOVATED AREAS MODIFY/EXTEND/INSTALL NEW SPRINKLER PIPING AND
SPRINKLER HEADS FOR NEW SPACING REQUIREMENTS.
06/14/17