Loading...
HomeMy WebLinkAboutB17-0154_P2.3_1497477794.pdf1 1/2 " 2 2" V SK-1 2" SAN DESIGN DEVELOPMENT / PROGRESS THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF DESIGN DEVELOPMENT AND PROGRESS UNDER THE AUTHORITY OF JEFFREY W. MUSSER, PE #95820 ON MARCH 31, 2017. IT IS NOT TO BE USED FOR OTHER PURPOSES. VAIL CASCADE + ARIA RENOVATION 1300 WESTHAVEN DRIVE Vail, Colorado 04/20/2017 Revisions: Sheet Title: Project No: Sheet No: Issue Dates: (970) 748-1470 email: tab@vail.net fax: (970) 748-1471 Avon, CO 81620-7431 Post Office Box 7431 TAB The Architectural Balance Associates www.tabassociates.com Plotted: 4/19/2017 6:14:11 PM P:\DAL\BET\TABCO001\CAD\SHEETS\PLUMBING\P2.3 PLUMBING NEW FLOOR PLAN - ARIA BACK OF HOUSE.DWG - snahas A member company of SH Group, Inc. R Syska Hennessy Group, Inc. 1130 E. Arapaho Road Suite #525 Richardson, TX 75081 Tel: 972.470.0704 Fax: 972.470.5851 www.syska.com PLUMB NEW FLOOR PLAN - ARIA B.O.H. P2.3 1. INSTALL NEW SINK AND EXTEND AND CONNECT NEW 1/2" H & CW, 2" WASTE & VENT PIPING TO EXISTING HW, CW, WASTE AND VENT AT NEAREST POINT. BRANCH 1/2" CW TO ICE MAKER 2. CONNECT TO EXISTING PIPING FROM DEMO'D TOILET 1. REFER TO P0.1 FOR CONSTRUCTION NOTES. 2. IN RENOVATED AREAS MODIFY/EXTEND/INSTALL NEW SPRINKLER PIPING AND SPRINKLER HEADS FOR NEW SPACING REQUIREMENTS. 06/14/17