HomeMy WebLinkAboutB17-0227_5185 Main Gore Drive-Radiant Panel Schedule_1497223320.PDFRadiant Panel Schedule
Project #:5185 Main Gore Drive
Project Information
June 01, 2017
Project #:
Name:
Location:
Gordon Mason Residence
5185 Main Gore Drive
Vail, CO
Notes:
Design Conditions and Summary
Note that this project has rooms that may require a supplemental heat supply to meet the design load.
Load Calculation Method:Manual J8
Design Location:(User Specified) Vail, Colorado
Outdoor Temperature:-20.0 °F
Floorplans / Levels:
Garage Level 1,064 ft²
Entry Level 1,328 ft²
Second Level 2,378 ft²
Upper Level 2,656 ft²
Total Area:7,426 ft²
Component Losses:128,002 Btu/hr
Infiltration/Ventilation:45,474 Btu/hr
Radiant Back Losses:13,237 Btu/hr
Total Heating Load:186,713 Btu/hr
Radiant Heating:134,657 Btu/hr
Radiant Back Losses:13,237 Btu/hr
Other:38,819 Btu/hr
Total Heating Load:186,713 Btu/hr
Radiant Panel Details
Panel Type #1 - Embedded Slab
Slab Thickness:4.0 in
Tube Depth:2.5 in
Slab R per Inch:0.15 °F•ft²•hr/Btu•in
Spacing:12 in, 15 in, 9 in
Floorplans:
Garage Level 1,007 ft²
Entry Level 1,255 ft²
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
Note: Tube depth is measured from top of embedded layer to the centerline of the tubing.
See end of report for important Notes and Disclaimers.Page 1 of 2
Panel Type #2 - Concrete Thin Slab
Over-pour Thickness:2.0 in
Over-pour R per Inch:0.15 °F•ft²•hr/Btu•in
Sub-Floor Thickness:0'- 3/4"
Sub-Floor Rv:0.9 hr·ft²·°F/btu
Joist Construction:Joist 2"x10" pine, 16" OC
Joist Spacing:16 in
Joist Insulation Rv:30.0 hr·ft²·°F/btu
Insulation Rv 30.0 hr·ft²·°F/btu
Spacing:9 in, 12 in, 6 in, 10 in
Floorplans:
Second Level 2,224 ft²
Upper Level 2,517 ft²
Disclaimers
The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input datacarefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application.
IN NO EVENT WILL AVENIR SOFTWARE INC. (“AVENIR”) OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT OR
SPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTY
HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR’S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITED
TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT.
Name:Gordon Mason Residence
Project #:5185 Main Gore Drive
Radiant Panel Schedule
June 01, 2017
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
Note: Tube depth is measured from top of embedded layer to the centerline of the tubing.
See end of report for important Notes and Disclaimers.Page 2 of 2