Loading...
HomeMy WebLinkAboutB17-0227_5185 Main Gore Drive-Radiant Panel Schedule_1497223320.PDFRadiant Panel Schedule Project #:5185 Main Gore Drive Project Information June 01, 2017 Project #: Name: Location: Gordon Mason Residence 5185 Main Gore Drive Vail, CO Notes: Design Conditions and Summary Note that this project has rooms that may require a supplemental heat supply to meet the design load. Load Calculation Method:Manual J8 Design Location:(User Specified) Vail, Colorado Outdoor Temperature:-20.0 °F Floorplans / Levels: Garage Level 1,064 ft² Entry Level 1,328 ft² Second Level 2,378 ft² Upper Level 2,656 ft² Total Area:7,426 ft² Component Losses:128,002 Btu/hr Infiltration/Ventilation:45,474 Btu/hr Radiant Back Losses:13,237 Btu/hr Total Heating Load:186,713 Btu/hr Radiant Heating:134,657 Btu/hr Radiant Back Losses:13,237 Btu/hr Other:38,819 Btu/hr Total Heating Load:186,713 Btu/hr Radiant Panel Details Panel Type #1 - Embedded Slab Slab Thickness:4.0 in Tube Depth:2.5 in Slab R per Inch:0.15 °F•ft²•hr/Btu•in Spacing:12 in, 15 in, 9 in Floorplans: Garage Level 1,007 ft² Entry Level 1,255 ft² Created Using LoopCAD 2016 (6/7/2017) Version:16.0.0080 Note: Tube depth is measured from top of embedded layer to the centerline of the tubing. See end of report for important Notes and Disclaimers.Page 1 of 2 Panel Type #2 - Concrete Thin Slab Over-pour Thickness:2.0 in Over-pour R per Inch:0.15 °F•ft²•hr/Btu•in Sub-Floor Thickness:0'- 3/4" Sub-Floor Rv:0.9 hr·ft²·°F/btu Joist Construction:Joist 2"x10" pine, 16" OC Joist Spacing:16 in Joist Insulation Rv:30.0 hr·ft²·°F/btu Insulation Rv 30.0 hr·ft²·°F/btu Spacing:9 in, 12 in, 6 in, 10 in Floorplans: Second Level 2,224 ft² Upper Level 2,517 ft² Disclaimers The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input datacarefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC. (“AVENIR”) OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR’S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. Name:Gordon Mason Residence Project #:5185 Main Gore Drive Radiant Panel Schedule June 01, 2017 Created Using LoopCAD 2016 (6/7/2017) Version:16.0.0080 Note: Tube depth is measured from top of embedded layer to the centerline of the tubing. See end of report for important Notes and Disclaimers.Page 2 of 2