Design Conditions and Summary
Snow Melt System Design
Method Specify Loads Manually
Fluid Type:50% Propylene Glycol
Total Flowrate:34.36 USGPM
Max. Head Loss:22.4 ft water
Design Temp. Drop:25.0 °F
Total Area:3,034 ft²
Total Circuit Lengths:
Barrier PEX 5/8"4,189 ft
Total Circuits:19
Total Manifolds:4
Total Tubing Volume:56.31 USG
Glycol Volume (50%):28.15 USG
Total Snow Melt Load:380,415 Btu/hr
Patio Off Kitchen / Breakfast
Total Area:272 ft²
Heated Area:272 ft²
Construction:Snow Melt - Concrete
Slab Depth:5.0 in
Tubing:Barrier PEX 5/8"
Total Circuits:2
Avg. Circuit Length:182 ft
Total Length in panel:351 ft
Avg. Tube Spacing:9 in
Min Supply Temp:101 °F
Design Load:28,458 Btu/hr
Downward Loss:5,692 Btu/hr
Total Heat Load:
(User Specified Load)
34,150 Btu/hr
Rear Patio & Deck
Total Area:828 ft²
Heated Area:828 ft²
Construction:Snow Melt - Concrete
Slab Depth:5.0 in
Tubing:Barrier PEX 5/8"
Total Circuits:5
Avg. Circuit Length:228 ft
Total Length in panel:1,089 ft
Avg. Tube Spacing:9 in
Min Supply Temp:101 °F
Design Load:86,505 Btu/hr
Downward Loss:17,301 Btu/hr
Total Heat Load:
(User Specified Load)
103,806 Btu/hr
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
See end of report for important Notes and Disclaimers.Page 1 of 4
Snow Melt
Total Area:131 ft²
Heated Area:131 ft²
Construction:Snow Melt - Concrete
Slab Depth:5.0 in
Tubing:Barrier PEX 5/8"
Total Circuits:1
Avg. Circuit Length:186 ft
Total Length in panel:173 ft
Avg. Tube Spacing:9 in
Min Supply Temp:101 °F
Design Load:13,714 Btu/hr
Downward Loss:2,743 Btu/hr
Total Heat Load:
(User Specified Load)
16,457 Btu/hr
Snow Melt
Total Area:1,802 ft²
Heated Area:1,802 ft²
Construction:Snow Melt - Concrete
Slab Depth:5.0 in
Tubing:Barrier PEX 5/8"
Total Circuits:11
Avg. Circuit Length:227 ft
Total Length in panel:2,401 ft
Avg. Tube Spacing:9 in
Min Supply Temp:101 °F
Design Load:188,335 Btu/hr
Downward Loss:37,667 Btu/hr
Total Heat Load:
(User Specified Load)
226,002 Btu/hr
Name:Gordon Mason Residence
Project #:5185 Main Gore Drive
Snow Melt System Design Report
June 06, 2017
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
See end of report for important Notes and Disclaimers.Page 2 of 4
Name:Gordon Mason Residence
Project #:5185 Main Gore Drive
Snow Melt System Design Report
June 06, 2017
Manifold Summary
Manifold Name Circuits Flowrate Supplied
Temp.
Max Temp.
Drop
Manifold Type S/R
Length¹
S/R
Pipe
Manifold
Head Loss
Circuit
Head Loss
S/R
Head Loss
Total
Head Loss²
Manifold 1 11 20.41 101 25 None Selected --1.0 21.4 0.0 22.4
Manifold 2 1 1.49 101 25 None Selected --1.0 10.0 0.0 11.0
Manifold 3 5 9.38 101 25 None Selected --1.0 20.2 0.0 21.2
Manifold 4 2 3.08 101 25 None Selected --1.0 10.5 0.0 11.5
Total 19 34.36 -----22.4
(1) S/R Length = one way, (2) Total Head loss includes manifold, circuits and supply/return piping if specified.(1) S/R Length = one way, (2) Total Head loss includes manifold, circuits and supply/return piping if specified.
Tubing Circuit Details
Manifold 1
** Head loss for circuit tubing only
Circuit Areas Served Total
Length
Tube
Spacing
Area
Covered
Tubing Flowrate Head
Loss**
Temp
Drop
Load
B-1 Snow Melt 228 9 162 Barrier PEX 5/8"1.84 17.8 25 (25)20,335
B-2 Snow Melt 224 9 160 Barrier PEX 5/8"1.82 17.1 25 (25)20,116
B-3 Snow Melt 226 9 163 Barrier PEX 5/8"1.85 17.8 25 (25)20,459
B-4 Snow Melt 223 9 162 Barrier PEX 5/8"1.83 17.3 25 (25)20,255
B-5 Snow Melt 224 9 164 Barrier PEX 5/8"1.85 17.8 25 (25)20,512
B-6 Snow Melt 225 9 164 Barrier PEX 5/8"1.86 17.9 25 (25)20,558
B-7 Snow Melt 227 9 164 Barrier PEX 5/8"1.86 18.1 25 (25)20,596
B-8 Snow Melt 226 9 163 Barrier PEX 5/8"1.85 17.9 25 (25)20,474
B-9 Snow Melt 227 9 163 Barrier PEX 5/8"1.85 18.0 25 (25)20,488
B-10 Snow Melt 228 9 163 Barrier PEX 5/8"1.84 17.9 25 (25)20,399
B-11 Snow Melt 243 9 174 Barrier PEX 5/8"1.97 21.4 25 (25)21,810
Total -2,501 1,802 -20.41 21.4 226,002
Manifold 2
** Head loss for circuit tubing only
Circuit Areas Served Total
Length
Tube
Spacing
Area
Covered
Tubing Flowrate Head
Loss**
Temp
Drop
Load
A-1 Snow Melt 186 9 131 Barrier PEX 5/8"1.49 10.0 25 (25)16,457
Total -186 131 -1.49 10.0 25 16,457
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
See end of report for important Notes and Disclaimers.Page 3 of 4
Name:Gordon Mason Residence
Project #:5185 Main Gore Drive
Snow Melt System Design Report
June 06, 2017
Manifold 3
** Head loss for circuit tubing only
Circuit Areas Served Total
Length
Tube
Spacing
Area
Covered
Tubing Flowrate Head
Loss**
Temp
Drop
Load
C-1 Rear Patio & Deck 232 9 172 Barrier PEX 5/8"1.95 20.2 25 (25)21,622
C-2 Rear Patio & Deck 226 9 159 Barrier PEX 5/8"1.81 17.1 25 (25)19,997
C-4 Rear Patio & Deck 226 9 168 Barrier PEX 5/8"1.91 18.9 25 (25)21,103
C-5 Rear Patio & Deck 224 9 167 Barrier PEX 5/8"1.89 18.4 25 (25)20,933
C-6 Rear Patio & Deck 229 9 161 Barrier PEX 5/8"1.82 17.6 25 (25)20,151
Total -1,138 828 -9.38 20.2 103,806
Manifold 4
** Head loss for circuit tubing only
Circuit Areas Served Total
Length
Tube
Spacing
Area
Covered
Tubing Flowrate Head
Loss**
Temp
Drop
Load
C-7 Patio Off Kitchen / Breakfast 182 9 137 Barrier PEX 5/8"1.55 10.5 25 (25)17,131
C-8 Patio Off Kitchen / Breakfast 182 9 136 Barrier PEX 5/8"1.54 10.4 25 (25)17,019
Total -364 272 -3.08 10.5 34,150
Disclaimers
The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data
carefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application.
IN NO EVENT WILL AVENIR SOFTWARE INC. (“AVENIR”) OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT ORSPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTYHAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR’S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITEDTO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT.
Created Using LoopCAD 2016 (6/7/2017)
Version:16.0.0080
See end of report for important Notes and Disclaimers.Page 4 of 4