HomeMy WebLinkAboutCR letter.pdfjmechling@CTLThompson.com
to DAVID
RE:
Tue, Jul 12 2:45 PM
CTL/Thompson provided a geotechnical Consultation report to Mr. Keith Novich for residential building on Lot 22
Vail Village West, Filing No.1 (aka 1740 Sierra Trail) in Vail. You asked if the report was in compliance with
International Building Code 2015.
The only reference to IBC in the report is item no.5 on page 22. The reference is regarding vapor barrier
installation. We suggested the 2003 IBC code be check to identify if a vapor barrier is required. We suggest the
design team check if the vapor barrier is required by 2015 IBC. Otherwise to the best of my knowledge the
report is in compliance with IBC 2015.
From: DAVID [mailto:snapoutofit2@msn.com]
Sent: Tuesday, July 12, 2016 10:01 AM
To: Mechling, John <Jmechling@CTLThompson.com>
Subject:
Thank you for your help.
Sent from Windows Mail
The Nova Group
July 13, 2016
To: Vail Building Dept.
Re: Novick Residence -Keystone Retaining Wall
Cc:
To Whom It May Concern:
/"' JI/ P.O. Box 3342 01 The Nova Group
~ ,Yail,Colorado 81658
Cell: 970-390-0931
E-mail: snapoutofit2@msn.com
An Engineered stamped detailed drawing for a Keystone Retaining Wall will be submitted by August
1, 2016. There will be no work done on retaining walls until this is approved.
Sincerely,
David Irwin
THE-NOVA-GROUP.COM