HomeMy WebLinkAboutUtility Verifications_2.pdfUTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject P perty Address: _1_7_4o__,,s ..... ie_r_ra,,...T_r_a_il ______ Lot~ Block Subdivision: Vail Viii. W. Fig. 1
Phone: 901-484-1319 Prima ontact IO n r Repre en at e: _K_e_it_h_N_o_v_ic_k __________ _
Plans Dated: 03/03/14 --------
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McClemon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy Please see attached email 4/7/16
970.262.4032 (tel) 8rYZu_ 970.262.4038 (fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845. 7218 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4 713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael_johnson@cable.comcast.com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
From: Mace, Brittany Britt.:my Mace; .:i; xcele11erc;y.corr1 #
Subject: RE: 1740 Sierra Trail, Vail, CO -Utility Approval Form for Vail DAB
Date: April 8, 2016 at 9:08 AM
To: Keith Novick kanr.wi<Yi'"Ci!lliJr. com
Hi Keith,
I currently do not see a good meter location. Please take into consideration that this may be an issue
when you apply for gas service. We may need to look at a remote meter set. Please apply for service
with the Builders Call Line
b!!P-://www.xcelencrg,Y..com/Partners/Builders/Service Activation
Thanks!
Britt Mace
Xcel Energy I Responsible By Nature
Designer, Design Dept. I Mountain Division
200 W. 6th St PO.Box 1819 Silverthorne, CO 80498 -1819
P: 970.262.4032 F: 970.262.4038
E: brittan)'..mace@xcelenergy.com
Office Hours: Monday -Friday 8:30am -4:00pm. For immediate concerns please contact the front
desk 970.262.4025
XCELENERGY.COM
Please consider the environment before printing this email.
From: Keith Novick [mailto:kanovick@gmail.com]
Sent: Thursday, April 07, 2016 12:27 PM
To: Mace, Brittany
Subject: 1740 Sierra Trail, Vail, CO -Utility Approval Form for Vail DRB
XCEL ENERGY SECURITY NOTICE: This email originated from an external sender.
Exercise caution before clicking on any links or attachments and consider whether you know the
sender. For more information please visit the Phishing page on XpressNET.
Sincerely,
Keith
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of V ii.
Prim
Authorized Signature
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McClemon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax) )//; 1.1, /,,' /Ztzr"----·
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
brittany. mace@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970 .4 77 .5449 (tel)
970.845. 7218 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4 713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael_johnson@cable.comcast.com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
Subdivision: Vail Viii. W. Fig. 1
Phone: 901-484-1319
Plans Dated: 03/03/14 --------
Comments Date
Colorado Revised Statutes Title 9, Date:
Article 2.5, prohibits any unguarded 2016.04.07
activity within 10 feet of energized 15:31:43
overhead power lines. -06'00'
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
/ ,,
;\"
I \
I
I \
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of V · .
---+--Hr'"--1-T_r_a_il ______ LotE_ Block Subdivision: Vail Viii. W. Fig. 1
Phone: 901-484-1319 Prima ve: Keith Novick
Plans Dated: 03/03/14 -------Primary Contact/Owner Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McClernon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4713 (tel)
303 .603.1004 (fax) Approved by Comcast 4-7-2016
Contact: Michael Johnson M/chaet Johnso;
Michael.Johnson@cable.comcast.com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel. roussin@dot.state.co.us
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vajl-
Authorized Signature
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McClernon
kelly.mcclemon@centurylink.com -XCEL HIGH PRESSURE GAS r 970.406.1784 (tel) out on Fri.
v ' 970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032 (tel) Im 970.262.4038 (fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax) Im
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael_johnson@cable.comcast.com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
1. Utility locations must be obtained before digging.
Y/0
Subdivision: Vail Viii. W. Fig. 1
Phone: 901-484-1319
Plans Dated: 03/03/14 --------
Comments Date
/,"'
) > '5 IAl2-5 . Y·--1l-1r;;
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
+ (f 2<1 40' 60' --------SIERRA TRAIL ( 45' RADIUS ROW) • .._ MH / / ~~t CAP LS 24311-..c """"' ,, •> NI) DISTANCES AlQNQ PRICPERf"t LINES SHOWN HEJE>H Ill£. LOT 21 LI er_) ON 1ltE SUBDMSIDN PlAT ONlY. A BOLilllM'I' Sl..llYEY WDULD "" TO DETERMIHE THE 1RUE DIMENSIONS OF 1H! I.Of MD WHICH 1MY VNff FROM 'THE Pl.ATIED DlllEHSDIS. '----..f'"-~ I I I -------.J ,' ----DEa< -------J\ \ ' LOT 14 '\ HIGHLAND MEADOWS FlUNG NO. 2 ' CMRtEADA POl!alJIE ' ' \ \ \ r ',..-___ / 'I~ I I I LOT 22 D.253 ACRES (CALC.) NO llWJllCS • 0.2' DIA PVC ('IElrncAL) 0 0.6' DIA P\C (VERTICAL) CMRHEAD l'O'lllERl.ME IMPRO~ENT LOCATION CERTIFICATE \ I heniby certify that this lmproo.<em9'1t Location Ctrilflcate waa prepared '°' MQND'QIM CAP0'4 RfSO' !D!7' LJQ l$W: • ~~t t: :. nr::I~ I:! ":orrw~~l=:~::.~~ur:~ :d :: i~ lrnpR:1¥9mM't trnw. J further ca1lfy that the tnprovement. on the above dlllla"bed porcel on thl• date. 11/Ul/13, except utlfty connectlona. ore enthty within the baundarille o1' th• PCFOll. except a• lhown, that th.,.. are no Mcroachm.,ta upon the dmcrlb.t preml-by lmprowrnen'bl on any ad)*'lng prwnr-., except a• Indicated, CS'ld that th.-. 11 no apparent rdd.-ice or llgn of any .alMlent c:ronlnc;i « burden~ any part of eald pcrcll, .xcept a. noUc:I. m.,!-WV:•!!14'.,'t;t11i11U"1ll!JI 411111 tlGHWAY 8 a: 24. EAGl.£-VAIL P.o. aox 12J0 EDWMDS. CO. 91832 (070)Hl-1400 K~ N asas t s'1' ~ '"" f'CUND PIN ,a RED PLASTIC CAP LS 2983 LOCATED SOl'32'24W 1.10' EDCE ASPHALT ROAD FROM Pl.Ana> CORNER ________ L ______________ _ Al.PINE DRIVE (50' ROW) 1ULC.I* DllL 9'I": ... PD8T LOT 15 5) MS SUMY AND lHE INFORMATION <X>NTMm> HEREDN IS 1lE PROPERTY OF EMU VNJ.EY SURYE"r'INCt INC. MD IS IHTtHOED F'OR THE SOLE LI.: OF TtiE CIUGM.. CLIENT ONLY. Ntf USE Of OR TIWtSf!R TD O'THERS 5 PROHlllTED. 8) MSIS OF PROflER1Y ~E LOCATION: MONJIENTS F'OUND AT THE MOST !ASIERl..Y CORNER OF LOIS 20/21 AND THE SOU11i ANQL£ POM' LDT 21. (SEE DRAWINO). 7) BlaDINQ SETMCk INFORMATION IS NaT PU.nm. FIRJOR lO Ntf DESION OR COHSIRUCl"ION IMPROYEt.iENTS ON TIIS PRCPERT't, THE 10WN OF VAIL SHOll..D EIE COffDCTED FOR CORRECT BULDINQ SE"FIMCK INFORMATION. 8) a1:EA~ = ~F~TMMEs~~Ms~~~RES MAY EXIST t) 1HERE !MY E EVIDINC£ OF A PRE-EXISTlll: IURED SfRUC'IURE ON A PCIRl'ION Of lH1S PROPERr'I'. A NEiQetR M.sO WEM1lOHED rr AT THE TIME OF SURVEY. 10) NO t>Al\IE¥MY. t 1) NO POSTED NJDRE:sS. 'Al. HIGHLAND MEADOWS FILING NO. 2 IMTE: 11/20/f:S PMIE: 1 OF' f IMPROVEMENT LOCATION CERTIFICATE LOT 22 VAIL VILLAGE WEST, FILING NO. TOWN OF VAIL EAGLE COUNlY, COLORADO JOB No. 152
s" i § 0 ~ !!2 td ... ~. ~: ~K : •1i ~ ~i~~ ~ ~ ii~~ .., ~.): ~ I '!•j ~ !"'~ ~·-n ·~1~ ~ 'P g ;;@~ -~ !. ' ~ ~.! ''· i e ,,~, ~ ~~! ·-~" ~ r i~~~ M • ~ , I : ;~! ~ §d• ' e 'i~ : ~1· • . ~ d. ~ ~~ i;2..i~ ~ ~ i!!; Hi i "'i~·· ~; :~~; i I ~~·~ ~ ,., •• ~ ~·r ~ ~G§ • >I, l! •• ,. ~ ~ !!,I i ~~l M; !~i~ ~ ~E ~B~~ ~ ~ ~~115tl ~ i~ ~ ';C" ... ~ <;'.,.. '°"'
r------1
I I I I I I I r-----1 I
I
I
\
I
I
I
I
\
·~ !~
I -"~-\ ./· ~ I _,, !~ I ./·
1 --,
I I I I
I I I I I
I
I I I I
I I I I I I I I I I I