Application for Design Review
Changes to Approved Plans
General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An applica-
tion for Design Review cannot be accepted until all required information is received by the Community development De-
partment. Design Review approval expires one year from the date of approval, unless a building permit is issued and
construction commences.
Submittal Requirements:
The Town of Vail offers two (2) methods for submittal of materials for review of applications. Materials can be submitted
either digitally or on paper. Whichever method you select all materials shall be submitted in that format throughout the
Design Review process. The Town encourages you to consider using the submittal of digital documents and plans.
If submitting digitally all elements of the application shall be uploaded to the Town's share file site as a complete set of
materials. If submitting paper three (3) copies of the materials noted with an asterisk (*) and one (1) copy of all others
are required. The materials necessary to have a complete application are as follows:
1. Copies of all pertinent approved plans with illustrated, labeled changes.
2. Joint Property Owner Written Approval Letter, if applicable..
Fee: $20
Single Family I Duplex P Multi-Family ri Commercial
Description of the Request: DRB150236 Ford Park Traffic Control Gates - reduce number of gates from
2 gates to 1 gate.
Physical Address: 700 S Frontage Road East
Parcel Number: 2101-081-0000-2 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Property Owner: Town of Vail
Mailing Address: 75 South Frontage Road, VAil, CO 81657
Phone: 970-479-2100
Digitally zignetl by Totltl Oppenheimer
Owner's Signature: Todd Oppenheimer
DN.cZ Todd Oppenheimer,o=Townof Vail,ou=Departmentof Publl<Works,
email=toppeneime,�ail9nnm.=Ds
e . 6 ar a6Be
Primary Contact/ Owner Representative: Todd Oppenheimer
Mailing Address: Department of Public Works, 1309 Elkhorn Drive, Vail, CO 81657
Phone: 970-479-2161
E-Mail: toppenheimer@vailgov.com Fax: 970-479-2166
For Office Use Only:
Cash CC: Visa/ MC Last 4 CC# Exp. Date: Auth # Check#
Fee Paid: Received From:
Meeting Date: DRB No.:
Planner: Project No:
Zoning: Land Use:
Location of the Proposal: Lot: Block: Subdivision:
Dec 2015
TOWN OF V►4lt `
JOINT PROPERTY OWNER
WRITTEN APPROVAL LETTER
The applicant must submit written joint property owner approval for applications affecting shared ownership properties
such as duplex, condominium, and multi-tenant buildings. This form, or similar written correspondence, must be com-
pleted by the adjoining duplex unit owner or the authorized agent of the home owner's association in the case of a con-
dominium or multi-tenant building. All completed forms must be submitted with the applicants completed application.
I, (print name) , a joint owner, or authority of the association,
of property located at , provide this letter as written
approval of the plans dated which have been submitted to the
Town of Vail Community Development Department for the proposed improvements to be completed at the address not-
ed above. I understand that the proposed improvements include:
I understand that modifications may be made to the plans over the course of the review process to ensure compliance
with the Town's applicable codes and regulations; and that it is the sole responsibility of the applicant to keep the joint
property owner apprised of any changes and ensure that the changes are acceptable and appropriate. Submittal of an
application results in the applicant agreeing to this statement.
Signature Date
Print Name
DESIGN REVIEW PROCESS
TOWN OF VAIL `
Pre-application Meeting
A pre-application meeting with Town of Vail Staff is not required; however, highly recommended. The purpose of a pre-
application meeting is to identify any critical issues pertaining to the proposal and to determine the appropriate development
review process for an application. Please call the Development Review Coordinator at 970-479-2128 to schedule.
Deadlines and Meeting Dates
The Design Review Board meets on the 1st and 3rd Wednesdays of each month beginning at 3:00 pm. Complete
applications are due in the Office of Community Development no later than 12:00 noon on the submittal deadlines attached.
Application Submittal
Submit all required information under the submittal requirements section of this application by the deadlines stated above.
Incomplete applications will not be processed. Upon receipt of a complete application, the Community Development
Department shall review the submitted materials for general compliance with the appropriate requirements of the zoning
code. If the application is not in compliance with zoning code requirements, the application and submittal materials shall be
returned to the applicant with a written explanation of non-compliance.
Staff Review
The Administrator (a member of the Planning Staff) will review and either approve a Design Review application, approve it
with conditions, deny the application, or refer the application to the Design Review Board for a decision. All Staff approvals
are reviewed by the Design Review Board and any administrative decision is subject to final approval by the Board. The
Board reviews applications and may approve, approve with conditions, deny the application, or table the application to allow
applicants to respond to comments.
Design Review Board Meeting Requirements
Prior to the meeting, for new construction and additions, the applicant must stake and tape the project site to indicate
property lines, proposed buildings and building corners. All trees proposed to be removed must be marked. The applicant
must ensure that staking done during the winter is not buried by snow.
The applicant, or their representative(s), shall be present at the Design Review Board public meeting. The item will be
postponed if the applicant fails to appear before the Design Review Board, on their scheduled meeting date.
TOWN OF VAIL
DESIGN REVIEW BOARD
2016 Submittal Deadlines and Meeting Dates
PLEASE NOTE: COMPLETE applications are due in the Office of Community Development
NO LATER THAN 12:00 NOON on the submittal deadlines below:
SUBMITTAL DEADLINE MEETING DATE
December 14, 2015 January 6, 2016
December 28, 2015 January 20, 2016
January 11, 2016 February 3, 2016
January 25, 2016 February 17, 2016
February 8, 2016 March 2, 2016
February 22, 2016 March 16, 2016
March 14, 2016 April 6, 2016
March 28, 2016 April 20, 2016
April 11, 2016 May 4, 2016
April 25, 2016 May 18, 2016
May 9, 2016 June 1, 2016
May 23, 2016 June 15, 2016
June 13, 2016 July 6, 2016
June 27, 2016 July 20, 2016
July 11, 2016 August 3, 2016
July 25, 2016 August 17, 2016
August 15, 2016 September 7, 2016
August 29, 2016 September 21, 2016
September 12, 2016 October 5, 2016
September 26, 2016 October 19, 2016
October 10, 2016 November 2, 2016
October 24, 2016 November 16, 2016
November 14, 2016 December 7, 2016
November 28, 2016 December 21, 2016
December 12, 2016 January 4, 2017
December 27, 2016 (Tuesday) January 18, 2017
TOWN OF PAIL'
All applications must be complete. An incomplete application will be returned to the applicant and will not be
scheduled for review.
PROPOSED MATERIALS
Building Materials Type of Material Color
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
Exterior Lighting
Other
Notes:
Please specify the manufacturer's name, the color name and number and attach a color chip.
PROPOSED LANDSCAPING
Botanical Name Common Name Quantity Size
PROPOSED
TREES
AND SHRUBS
EXISTING TREES
TO BE REMOVED
Minimum Requirements for Landscaping: Deciduous Trees—2" Caliper
Coniferous Trees—6' in height
Shrubs—5 Gal.
Type Square Footage
GROUND COVER
SOD
SEED
IRRIGATION
TYPE OF EROSION CONTROL
Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
Current approval is for 2 opposing gates with 10' - 12' gate arms, painted forest green with minimal
reflective material. Proposed location conflicted with HP gas main. Revised proposal is for 1 gate
with 30' gate arm, painted forest green with minimal reflective tape to be applied by TOV after gate
installation.