HomeMy WebLinkAboutB16-0267 Special Inspections.pdf'IVlfN~ SPECIAL INSPECTION AND TESTING SCHEDULE
(IBC 1704) ~Name:~ji\~L'~±1.fk~'2, Permt# fJlll-of.:z
Owner's Name~ .. ~:-~~ --Alk\i\J.J~il-0 C<MEtJi#'® -~.__-
Testing Inspection · Signature · ' J Ptlnt Name Date
Agency: 1>&/10 A;-'{Ollk}<:J <rz.l· t?
·Testing Inspection Slgnelure ft-~f/ I t:::vXf>tl.me Date
Hereby certifies that the Testlngflnspectlon Agency named above ~s been engaged to perform structural tests and
Inspections during conatructlon as checked below, to sali&fy an applicable portions of the Building Code.
Prior lo final Inspection, the Inspection Agency shall submit a statement that all Items of designated work performed
were reported. Any items checked but not teated or fnspected wiH be noted and explained. Whenever any designaled
Items on the list are reedy for sampling, tesUng, or Inspection, II shall be the responslblHty of Ute contractor lo give
timely notice to the Inspection agency so that the required services may be performed.
REINFORCING STEEL:
Tensile & Bend, one set per heat par __ tons
__ Inspection of Placement
_ lnspeetlon of Weldtng
~ Epoxy
MASONRY:
__ PreUm. A<:Geplanco Tesla (Masonry Units. Wal Prisms)
__ Subsequent Tests (Mortar, Grout. Fleld Wall Prisms)
__ ln~pectlon of Placement and Groulflg
CONCRETE SHOTCRETE GROUT AND MORTAR· .
Concrete Shol Grout Moflal'
Aggregate tesls for deslon
Sdlatlllly al aggregalea
MIX Designs
Test Panel
8aCGh Plant lnspeGUon
Cemenl Grab Semple -·--Inspect Plllclng
c:oi.easlon Tests cast Specimens
Pick-up Samples
Shrinkage Bara ---YleldCheck
,..Check
Ory Unll Weigh!
PRECAST CONCRETE:
Reinforcing Tests
Inspection of Reinforcing Placement
Tendon Tests
lnspecllon of Tendon Placement
lnspecllon of Concrete Placement
lnapedbn of Concrete Ba1chlng
Inspection of Panel Atlaclvnent & Inserts
Compresston Teats
lnspecllon of Slresslngffransfer
PILING, CAISSONS, CAPS, nes:
__ lnspecUon of Relnforclng Placement
__ lnspecllon of Concrete Placement
__ Inspection of Concrete Batching
Specify other tests. Inspections or spectaf lnstJtJcllons required.
-4-
UNDERPINNING: -2(_ Temporary/Permanent
Inspection of Steel Fabrication
Inspection of Reinforcing & Forms
Inspection of Concrele Placement
Inspection of Tiebacks
SOIL NAILS;
Temporary Shoring
Permanent Wall
STRUCTURAL STEEL:
Sample & Test (list specific members below}
Shop ldentlllcatlon & Welding Inspection
Shop Ultrasonic lnspecllon
ShOp Radiography :X: Field Welding lnspecllon =:K.. Flekl Bolling lnspecllon
Fle~URrasonlclnspedlon
Field Radiography
Metal Deck Weldfng Inspection
FIREPROOFING:
_ Inspection & Placement
SOILS:
Acceptance Te&ts
Moisture-Density Determination
Field Density
Drilled Piers
Deep Foundation
STRUCTURAL WOOD:
Inspection of Fabrication
Inspection of Truss Joint Fabrication
Sample & Test Components
Inspection of Glu Lam Fabrication
SMOKE CONTROL:
SPECIAL CASES:
SPECIAL INSPECTION:
__ Seismic Resistance
__ Wind Requirements
Job• Name: 'tf '1 \Jld.v ~Q,
Job Address: t.t't Jft\v R:Q. °'2
Permit No.: ~I(, -01,C, 1
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The owner or his/her representative, on the advice of the design professional in responsible charge, shall
complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tests
Scheduled to the Town of Van for review and approval. Signatures are required on both pages;
photocopied or faxed signatures are acceptable.
The owner and his/her general contractor, where applicable, shall also acknowledge the following
conditions applicable to Special Inspection Testing:
1. Contractor is responsible for proper notlficatfon lo the Inspection or Testing agency for items
llsted.(Page 1) (IBC 1704)
2. Only the testing laboratory should take samples and transport them to their laboratory.
3. Copies of all laboratory reports and Inspections are to be sent directly to the Town of Vall by the Testing
agency on a weekly basis.
4. Inspection agency to submit names and qualiHcatlons of on-site special inspectors lo the Town of Vail
for review and approval.( Page 2)
5. The special Inspector Is responsible to Immediately notify the Town of Vall Building Official In writing of
any concerns and/or problems encountered.
6. It is the responsiblUty of the contractor to review the Town of Vall approved plans for additional
Inspection or testing requirements that may be noted. A pre-construction conference at the job site Is
recommended to review special inspection procedures.
7. The special Inspector shall use only the Town of Vall approved drawings.
8. All special Inspection field reports must be left on site for review by the Town of Vall staff prior to
required Inspections or re-Inspections.
BEFORE OCCUPANCY WILL BE GRANTED: The special Inspection agency shall submit a signed and
sealed statement that all items requiring testing and Inspection were fuffilled and reported. Those Items not
tested and/or Inspected shall be noted in this statement. A copy of the statement shall be maintained at the
job site for the Building Inspector's review prior to final Inspection.
Ackno?~o.t> ----__ ,.-. --· --.. ---.
Owne~-sii~-_:_--AIEJ.Mno ~\Lt/\
Special Inspection
Agency: _____________ ---------------
Project -Arch/Eng: _:Wii•~ =--------~~t-11~~~.-.-irai~-.---...""'"'"""'
-3-
Job Name: '1 q \bti v \!.o
Job Address: Lf''f '1fi\ \/ @-0 <iii)
Permit No.: f>\lo -DUI}
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The owner or his/her representative, on the advice of the design professional In responsible charge, shall
complete. seal, sign end submit a copy of the Speclal Inspection Agreement and structural Tests
Scheduled to the Town of Vall for review and approval. Signatures are required on both pages;
photocopied or faxed slgnalures are acceptable.
The owner and his/her general contractor, where applicable, shall also acknowledge the following
conditions applicable to Special Inspection Testing:
1. Contractor fs responsible for proper notlficaUon to the Inspection or Testing agency for items
Usted.(Page 1) (IBC 1704)
2. Only the testing laboratory should lake samples and transport them to their laboratory.
3. Coples of ell laboratory reporls and Inspections are to be sent directly to the Town of Vall by the Testing
agency on a weekly basis.
4. Inspection agency to submit names and quallflcatfons of on-site special Inspectors to the Town of Vall
for review and approval.( Page 2)
5. The special Inspector Is responsible to lmmedlatelY notify the Town of Vall Building Official In writing of
any concerns and/or problems encountered.
6. It Is the responslblllly of the contractor to review the Town of Vall approved plans for additional
Inspection or testing requirements that may be noted. A pre-construction conference at the job site ls
recommended to review special Inspection procedures.
7. The special Inspector shall use only the Town of Vall approved drawings.
8. AD special fnspectJon field reports must be left on site for review by the Town of Vall staff prior to
required Inspections or re-lnspeclions.
BEFORE OCCUPANCY WILL BE GRANTED: The special Inspection agency shall submit a signed and
sealed statement that ell Items requiring testing and Inspection were fulfHled and reported. Those Items not
tested and/or Inspected shall be noted In this statement. A copy of the statement shall be maintained at the
Job site for the BUiiding Inspector's review prior to final Inspection.
Acknowledgement
Project
Arch/Eng:
-3-
".m.n Data
(pk/11
Date