HomeMy WebLinkAboutB16-0267_A311_1499897940.pdf1 WALL SECTION DETAIL 1" = 1'-0" LOWER LEVEL EL. +0-0" (8155'-6") BASEMENT LEVEL EL. -13-2" (8142'-10") GAME ROOM EXTERIOR ENTRY LIVING ROOM SLOPE SLOPE 1 4":1'-0" NEW FOUNDATION WALL & FOOTING; 5" CAST-IN-PLACE CONCRETE (SEE STRUCTURAL) DROPPED GWB CEILING STONE CLADDING STONE PAVERS STONE WALL BEYOND CUT EXISTING FOUNDATION WALL; BRACE WITH STEEL CHANNELS; SEE STRUCTURAL EXISTING WOOD FLOOR ON 14" JOISTS TERMINATION BAR; FASTEN @ 8" O.C. FURRING WALL (REFER TO PLANS) CONCRETE SLAB PER STRUCTURAL CARPETING STEGO WRAP 15 MIL (TAPE TO WALL; INSTALL PER MFQR REC.) 11 2" MIN. HIGH-DENSITY (2.0 PCF) CLOSED-CELL SPF IN CAVITY AGAINST FDN WALL & MIN. 1 2" BEHIND STUDS (HOLD STUDS 1 2" MIN. OFF CONCRETE ADCOR ES WATERSTOP TEMPORARY ANCHOR 6" PREPRUFE BACKCOVER PREPRUFE 160R MEMBRANE HYDRODUCT 200 DRAINAGE MAT PROPERLY LAP PREPRUFE BETWEEN FOOTING & WALL HYDRODUCT COIL 600 12 " CLOSED CELL EXP. JOINT FILLER W/ POLYURETHENE SEALANT ALONG TOP EDGE ƒ 7(( &211(&725 )520 +<'52'8&7 &2,/  72 ‘ 6&+ 800 PVC PIPE (THRU FOOTING TO GRAVEL BELOW SLAB); SEE C-1 FOR REC. LOCATIONS SHEET METAL FLASHING W/ HEMMED EDGE TO COVER WPM BELOW STONE CLADDING COLD JOINT DRAINAGE MAT; LAP OVER DRAINGE MAT ON WALL BITUTHANE; CAREFULLY TORCH OFF POLYETHYLENE FACER TO ALLOW HYDROTECH TO LAP OVER AMERICAN HYDROTECH 6125 FR; EXTEND OVER EDGE OF SLAB, OVER COLD JOINT, AND OVER BITUTHANE PREPRUFE 160R MEMBRANE HYDRODUCT 200 DRAINAGE MAT ON HORIZONTAL, INSTALL 12" TO 16" WIDE STRIPS OF HYDRODUCT 200 OVER TOP OF FOOTING & EXTEND INTO GRAVEL 2 WALL SECTION DETAIL 1" = 1'-0" GARAGE EXTERIOR HOME THEATER LOWER LEVEL EL. +0-0" (8155'-6") BASEMENT LEVEL EL. -13-2" (8142'-10") SLOPE SLOPE TO DRAIN SLOPE EXISTING FOUNDATION DRAIN TO REMAIN (WHERE EXISTS) EXISTING FOUNDATION DRAIN TO REMAIN (WHERE EXISTS) ADCOR ES WATERSTOP TEMPORARY ANCHOR 12" TO 16" STRIPS @ 4'-0" O.C.; EXTEND DOWN INTO CONTINUOUS HYDRODUCT COIL 600 HYDRODUCT COIL 600 ƒ 7(( &211(&725 )520 +<'52'8&7 &2,/  72 ‘ 6&+ 800 PVC PIPE (THRU FOOTING TO GRAVEL BELOW SLAB); SEE C-1 FOR REC. LOCATIONS GRAVEL (PER C-1) PERF. PIPE (PER C-1) FILTER FABRIC (PER C-1) ON HORIZONTAL, INSTALL 12" TO 16" WIDE STRIPS OF HYDRODUCT 200 OVER TOP OF FOOTING & EXTEND INTO GRAVEL TOP OF STRUCTURAL WALL IS LIMITED BY STRUCT ATTACHMENT OF LOWER LEVEL FRAMING TO EXG FOUNDATION WALL TERMINATION BAR, SECURE @ 8" O.C. 5" CONCRETE SLAB ON 2" METAL DECKING BITUTHENE TO COVER EDGE OF SLAB & COLD JOINT BETWEEN BOTTOM OF SLAB & TOP OF WALL & CREATE MIN. 6" OVERLAP W/ NEW PREPRUFE ON INTERIOR SIDE OF WALL; REMOVE & REPLACE SOIL & PAVEMENT TO INSTALL 1 2 " CLOSED CELL EXP. JOINT FILLER W/ POLYURETHENE SEALANT ALONG TOP EDGE DROPPED GWB CEILING DE NEEF INJECTO TUBE & FLEX LV GROUT; HAND-PLACE AND PACK @ TOP OF NEW WALL FURRING WALL (REFER TO PLANS) CONCRETE SLAB PER STRUCTURAL CARPETING STEGO WRAP 15 MIL (TAPE TO WALL; INSTALL PER MFQR REC.) FOUNDATION WALL & FOOTING; CAST-IN-PLACE CONCRETE OR SHOTCRETE (ONLY WHERE COVERED W/ PREPRUFE) 11 2" MIN. HIGH-DENSITY (2.0 PCF) CLOSED-CELL SPF IN CAVITY AGAINST FDN WALL & MIN. 1 2" BEHIND STUDS (HOLD STUDS 1 2" MIN. OFF CONCRETE HYDRODUCT 220 PREFRUFE 160R 5" CAST-IN-PLACE CONCRETE WALL; HORIZ & VERT. REINFORCEMENT PER ENGINEER DETAIL WATERPROOFING AROUND EACH REBAR PIN W/ LIQUID MEMBRANE (SEE PRE-049) REBAR DOWELS; EPOXY INTO EXISTING & NEW FOUNDATIO; SIZE & SPACING PER STRUCTURAL STAINLESS STL ANCHORS & STRAPS RECOMMENDED (TYP) GARAGE FLOOR WPM; VEHICULAR-GRADE POLYURETHANE TRAFFIC CAOTING SYSTEM (VENTED METAL DECK BELOW) A311 WALL SECTIONS PROJECT: 710 WEST LIONSHEAD CIRCLE - UNIT A VAIL., COLORADO 81657 970.477.2990 44 WILLOW PLACE DRAWN BY: DATE: REVISIONS: xxxx Lot 9, Block 6, Unit 3 Vail Village, First Filing Town of Vail, Eagle Valley Colorado MF 12.10.2016 XXX 00.00.00 ‹ .+:(%% ARCHITECTS PC COPYRIGHT 2013 NOT VALID FOR BUILDING PERMIT WITHOUT ARCHITECT'S WET STAMP 07/12/17