Fvr,nd,r,the Piali4Fdy
September 22, 2016
Debbie and Paul Ford
5444 S. Emporia Count
Greenwood Village, CO 80111
Re: Request to install air conditioning in Unit 27
Dear Debbie and Paul:
The Board of Directors reviewed your application to install air conditioning in its meeting September 14,
2016. The review was based on the following:
— Application Package submitted by Debbie September 8, 2016 and revised September 14, 2916
— Representations made by Justin Nielsen of Skyline Mechanical Inc. in the on-site meeting of
Justin,Tom Saalfeld, Debbie Ford and Gwen Scalpello
On file with the Association are signed Application for Unit Remodel and a Certificate of Liability for
Skyline Mechanical Inc. A construction agreement signed by the owner and by Skyline Mechanical Inc.
will be required before construction may begin
The application is approved with the following conditions:
— Exterior compressor unit: mounting is to incorporate vibration dampening; compressor will be
mounted on the east side of the balcony, below the deck rail, perpendicular to and as close to
the building as feasible
— All plumbing and electrical conduit will be contained entirely within Unit 27 with the exception
of the connection to the ceiling-mounted condenser unit serving the master bedroom,which
will penetrate the ceiling into General Common Element space above; connections to this unit
may be run just above the master bedroom ceiling in the General Common Element space
above
— Condensate from the interior units will be drained to a bathroom drain or to the clothes washer
drain on the loft level within the unit, not directly to the common waste lines
— No interior units may interfere with the operation of the fire sprinkler system
— The owner is responsible for all upgrades to electrical service to support this installation.
9 Vail Road Vail, CO 81657
800/872.7221 9701479.7100
All approvals are subject to the Construction Agreement, Rules and Regulations,Architectural Change
and Design Review of Unit Modifications, Common Element Modification Policy and Universal Policy on
Unit Renovations, all of which can be found on the 9 Vail Road website.
All logistics regarding parking, trash removal, construction materials delivery and building access should
be coordinated with Tom Saalfeld before any work starts.
By copy to Town of Vail Community Development,this letter also documents the Association's approval
for application for Town of Vail building permits and Design Review Board reviews.
Sincerely,
For the Board of Directors
Cc: Alfredo Catan, 9 Vail Road Board of Directors
Rhoda Kaplan,9 Vail Road Board of Directors
Julie Savage,9 Vail Road Board of Directors
Tom Saalfeld, Ptarmigan Management
J.R. Mondragon,Town of Vail Community Development
Chris Neubecker,Town of Vail Community Development
Justin Nielsen, Skyline Mechanical Inc.