Loading...
HomeMy WebLinkAboutDRB16-0473_Attached for Exterior Photos 5_1478904518.pdf Guest Bedroom Ceiling Unit nP o I 10 The first air conditioning unit will be inserted between the studs of the ceiling of t Ree guest bedroom. The guest bedroom is located on the second floor of the building;9 ?g6D of the deck in the prior picture. The refrigerant lines will be run up the corner of ttita:oo AM room and around the ceiling of the bedroom. They will be boxed in with drywall. The unit will be inserted in the ceiling close to the entrance to the bedroom. The water that is produced by this unit will be gravity drained into the guest bathroom sink of the on suite bathroom. Ceiling Unit SLZ-KAl2NA • i • • — H