HomeMy WebLinkAboutDRB16-0473_Attached for Exterior Photos 6_1478904520.pdf 11115.5.1.
Running of the Refrigerant Lines to the Third Floor 4 eP,
Once the refrigerant lines are in the guest bedroom, they will be run through the DRB
bedroom wall to the East Wall of the Great Room. They will be run to the ceiling, ?O PRO 16D
across the wooden decorative ceiling and to the west wall of the great room. This12:00:00 AM
will require lines to be boxed in and covered with drywall and wood so they are not
noticeable.
Master Bedroom Ceiling Unit
The second air conditioning unit will be inserted between the studs of the ceiling of
the master bedroom. The master bedroom is located on the third floor of the
building. The refrigerant lines will be run from the west wall of the great room and
across the floor of the attic space above the bedroom. The unit will be inserted in the
ceiling in the middle of the master bedroom . The water that is produced by this
unit will be gravity drained, through the attic space from the air conditioning unit
into the adjacent washer/dryer drain.
I.
iA . ---:: .
r.
if