Loading...
HomeMy WebLinkAboutDRB16-0505 Narrative.pdf Change Narrative: Simba Run Pool Air Handling Upgrades Reference: DRB16-0337 Description: Changed the location and placement of the exhaust air duct. Changed the intake air duct to provide separate summer and winter air intakes and provide more separation between them and the duct furnace. Background: The project was previously approved with the exhaust air duct extending up and over the 12 foot high back wall. Purpose: The purpose of the exhaust duct change is to improve aesthetics for several nearby owners by locating the duct work closer to the roof. The air intake chages were made to increase separation between the air intakes and the duct furnace and to simplify the installation. Details: As before, all system components will painted to match the color of the back concrete wall.