Loading...
HomeMy WebLinkAboutDRB16-0532 Action Form Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Bridge Road Bridge 2016 Application Number: DRB16-0532 Application Type: Exterior Alteration Date Applied: 12/05/2016 Project Description: Replacement of Bridge Road structure over Gore Creek CONTACTS Contact Type: Applicant Full Name: Town Of Vail (Chad Salli) Address: Phone: 970-479-2169 Project Address: Bridge Road Bridge over Gore Creek Job Site Location: Legal Description: Subdivision: Lot: Block: Parcel Number: BOARDS/STAFF ACTION Motion By: Forstl Action: Approved Second By: Cahill Vote: 3-0-0 Date: 12/21/2016 Conditions: Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). The four (4) concrete pilasters shall be reduced in size from six feet (6') tall by four feet (4') wide to four feet (4') tall by three feet (3') wide. The color of the concrete of the proposed bridge shall match the color of the concrete at the existing bridge over Gore Creek on Matterhorn Circle. Planner: Matt Panfil