HomeMy WebLinkAboutaction_form_drb_03-31-2017_58decd10f29ed-0.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:JMB Manning Trust Residence
2016 Application Number:DRB17-0092
Application Type:Change to Approved Date Applied:03/23/2017
Project Description:Changes include windows,gas meter,deck,headers
CONTACTS
Contact Type:Applicant
Full Name:Berglund Architects (Chris May)
Address:Phone:970-926-4301
Contact Type:Property Owner
Full Name:Jmb Manning Trust
Address:28 Atlantic Ave 317 Boston, MA 02110 Phone:None
Project Address:2440 Chamonix Lane (210314117004)
Job Site Location:
Legal Description:Subdivision:Lot:Block:
Parcel Number:
BOARDS/STAFF ACTION
Motion By:Action:Staff Approved
Second By:
Vote:Date:03/31/2017
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Prior to the issuance of a final certificate of occupancy, the applicant shall have completed all site and
landscaping improvements as shown on the approved Design Review Board.
- The applicant for this project is required to submit a foundation Improvement Location Certificate (ILC)
showing the foundation of the structure in compliance with the approved development plan in conjunction with
the building permit inspection process.
- The applicant for this project is required to submit a framing Improvement Location Certificate (ILC) showing
ridge and eave elevations in compliance with the approved development plan in conjunction with the building
permit inspection process.
Planner: Chris Neubecker