Loading...
HomeMy WebLinkAboutDRB17-0113_A3.1_1491598620.pdfPHASE 2A 1 A6.1 2 A6.1 REMOVE FLAGSTONE, STONE WALL CAP AND MASONRY VENEER @ INSIDE OF WALL. REMOVE TOP PORTION OF VENEER @ OUTSIDE OF WALL REMOVE EXIST. W.P. MEMBRANE REPLACE MASONRY VENEER, & WALL CAP NEW DRAINS - TIE INTO DRAIN @ LOWER SLAB ON GRADE PATIO. SEE DETAIL 4/A6.1 PROVIDE NEW 4" STONE PATIO ASSEMBLY: 1 1/2" FLAGSTONE OVER 1" GROUT BED OVER 1 1/2" TOPPING SLAB W/ NEW SNOW MELT TUBING PROVIDE NEW HOT FLUID APPLIED W.P. MEMBRANE RE: SPEC 13 RISERS @ 7 5/16" 12 TREADS @ 12" 8 RISERS @ 7 5/16" 7 TREADS @ 12" 6 RISERS @ 7 5/16" 5 TREADS @ 12" T.O. EXIST. FINISH @ 54' - 0" UP DN 5' - 3" 1' - 4" 6' - 1" 1' - 4" 13' - 1" 11' - 10 1/2" 16' - 3 1/2" 62' - 1 5/16" 65' - 9 1/4" PHASE 2B REMOVE SAND SET FLAGSTONE NEW 5" REINFORCED CONCRETE SLAB ON GRADE FLOOR DRAIN 3 A6.1 SLOPE SLAB ON GRADE EXIST. F.F. @ 58' - 0" REMOVE STONE VENEER 24" UP WALL TO APPLY NEW W.P. MEMBRANE PROVIDE NEW 4" STONE PATIO ASSEMBLY: 1 1/2" FLAGSTONE OVER 2 1/2" GROUT BED W/ NEW SNOW MELT TUBING IN GROUT BED 6" 6' - 11" 6" 5' - 6" 7' - 7" 21' - 0" 8' - 1 1/4" 1' - 1" 8' - 1 1/4" 1' - 1" 11' - 10 1/2" 12' - 11" 6" 7' - 1" 30' - 3" 13' - 6 1/2" 19' - 9 1/2" LINE OF TERRACE ABOVE T.O. EXIST. PATIO @ 57' - 6" T.O. EXIST. FINISH @ 55' - 0" T.O. EXIST. FINISH @ 54' - 5" T.O. EXIST. FINISH @ 54' - 0" EXIST. BENCH ENTRY COURTYARD BACKFILL UP GENERAL NOTES: 1.) ALL DIMENSIONS FROM EXISTING HOUSE DRAWINGS VERIFY IN FIELD US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Scale Date Drawn by Checked by Issue Date 4/4/2017 8:59:17 AM 1/4" = 1'-0" 84 BEAVER DAM REMODEL VAIL, CO A3.1 ENTRY STAIR FLOOR PLANS 4-4-2017 CPM HB 4-4-2017 PROGRESS SET 0' 2' 4' 8' 16' 1/4" = 1'-0" 2 MAIN LEVEL STAIR FLOOR PLAN REVISION SCHEDULE # DESCRIPTION DATE NORTH 1/4" = 1'-0" 1 LOWER LEVEL STAIR & COURTYARD FLOOR PLAN DRB APPROVED 4/7/2017 12:00:00 AM