Loading...
HomeMy WebLinkAboutDRB17-0135_Lapidus DRB_1492628417.pdfApril 18, 2017 DRB Application Project: Addition of air conditioning condenser & enclosure on 2nd floor balcony Location of condenser on unit balcony Condenser to be same model as shown and enclosed with same material as shown. This installation is on another 2nd floor unit in the same building. DRB APPROVED 4/19/2017 12:00:00 AM DRB APPROVED 4/19/2017 12:00:00 AM