Loading...
HomeMy WebLinkAboutDRB17-0153_S-1 Site Plan_1493665220.pdfINV. 87.5 94.2 97.5 EX. INV: 89.3 EXCAVATE AROUND EXISTING CULVERT AND CUT APPROX. 4-5' OFF END OF PIPE. PLACE THREE (3) BOULDERS AROUND OUTFALL. LOG BIOSWALE. EXCAVATE HILLSIDE AND PLACE LOGS PER DETAIL. GRADE TO PROVIDE FLOW TO THE EAST AT APPROX .5%. PROP. INV: ~89.5 .5% .5% INSTALL TWO (2) LOGS INTO HILLSIDE AS LANDSCAPE TERRACES NOTCH ELEV - 89.0 MAINTAIN CLEAR AREA: 4' EACH SIDE 10' NORTH SIDE INSTALL GRASSPAVE2 SOIL STABILIZER PER DETAIL. UTILIZE ONE ROLL (MODEL #1020) 3.3' x 65.6'. NEW ELECTRIC PANEL. SEE SHEET E-1 PLACE BOULDER SUPPORT AT LOG ENDS OVERFLOW NOTCH AT OUTFALL REMOVE AND DISPOSE OF EXISTING WOOD ELECTRIC SCREEN. SEE SHEET E-1 FOR ELECTRIC PANEL ALTERATIONS COBBLE SCOUR PROTECTION TO CREEK. USE ON-SITE MATERIAL TO THE EXTENT POSSIBLE DRAINAGE NOTCHES AT FLOWLINE COBBLE SCOUR PROTECTION TO CREEK. USE ON-SITE MATERIAL TO THE EXTENT POSSIBLE SWALE ACROSS THE HILLSIDE BEHIND LOGS - APPROX .5 % BACKFILL ACROSS FRONT OF LOG CUT ~24" x 6" NOTCH AT EAST END FOR FLOW TO CREEK FOR BIOSWALE, NOT FOR LS TERRACES 2-3" DIAM WOOD TREE STAKE. 24" O.C. 30" MIN INTO SUBGRADE LOG ACROSS HILLSIDE, OWNER SUPPLIED PLACE BOULDER AT LOG ENDS PLACE THREE (3) BOULDERS AROUND END OF CUT-OFF CULVERT CUT BACK END OF PIPE 4-5' OR AS SITE CONDITIONS ALLOW EXCAVATE INTO HILLSIDE AND PLACE LOGS. LOGS PROVIDED BY OWNER ON SITE. 2-3" DIAM WOOD TREE STAKE, 30" MIN INTO SUBGRADE. SWALE ACROSS THE HILLSIDE BEHIND LOGS WETLAND SEED MIX PER LS-1 OUTFALL ELEV: ~89.5 OVERFLOW NOTCH AT OUTFALL ELEV: ~90.0 SWALE: ~89.0 EXCAVATE TRENCH TO LAY LOG INTO BACKFILL WITH TOPSOIL 2-3" DIAM WOOD TREE STAKE, 30" MIN INTO SUBGRADE LOGS SUPPLIED BY OWNER 1 2 FILL RINGS WITH TOPSOIL. PROVIDE AT LEAST 1/2-3/4" TOPSOIL ABOVE TOP OF RINGS GRASSPAVE2 RINGS NATIVE SUBGRADE. GRADE TO DRAIN. NATIVE SEED MIX PROVIDED BY OWNER DRAWN BY DATE SHEET TOV JOB NO. FILE NAME Dept. of Public Works 1309 Elkhorn Drive Vail, CO 81657 ph. 970-479-2158 www.vailgov.com SCALE AMPHITHEATER BRIDGE - SITE PLAN GB RIPPLANTPROJ 4/27/17 RPI006 1"= 20' S-1 FORD PARK 2017 PROJECTS LANDSCAPE TERRACE SECTION SCALE 1 4"= 1'-0" BIOSWALE SECTION SCALE 1 4"= 1'-0" BIOSWALE ELEVATION SCALE 1 4"= 1'-0" GRASSPAVE2 SECTION N.T.S. DRB APPROVED 5/1/2017 12:00:00 AM