Loading...
HomeMy WebLinkAboutDRB17-0179_village center association approval_1494624000.pdf , o Village Center Association Date: 5/10/17 Jack & Lisa Welch 84 Summer Street Weston, MA 02493 Re: Village Center Association Board Approval The Village Center Association Board has approved the Interior construction project and proposed new Pella Exterior Patio Sliding Door System based on the preliminary drawings summitted by Greenauer Design Group with the following requirements: 1. All Exterior cladding to match existing color. 2. The glass to match existing. 3. Door system framing &jamb to match existing. 4. All exterior millwork and stucco to match existing. 5. Any other exterior work needs to be pre-approved before commencing. 6. Final Architectural stamped drawings, Electrical Engineer stamped drawings, Mechanical Engineering stamped (If required by TOV). 7. Village Center construction deposit base on 5%of construction cost. Please give us a call if you have any questions regarding the approval. Regards, i �i Mark Hallenbeck Village Center Property Manager `120 Willow Bridge Road, Suite 7 Vail, CO 81657 970.476.7997 • 970.476.1081 villagecenter@comcast.net