Date: 5/10/17
Jack & Lisa Welch
84 Summer Street
Weston, MA 02493
Re: Village Center Association Board Approval
The Village Center Association Board has approved the Interior construction project and proposed new
Pella Exterior Patio Sliding Door System based on the preliminary drawings summitted by Greenauer
Design Group with the following requirements:
1. All Exterior cladding to match existing color.
2. The glass to match existing.
3. Door system framing &jamb to match existing.
4. All exterior millwork and stucco to match existing.
5. Any other exterior work needs to be pre-approved before commencing.
6. Final Architectural stamped drawings, Electrical Engineer stamped drawings, Mechanical
Engineering stamped (If required by TOV).
7. Village Center construction deposit base on 5%of construction cost.
Please give us a call if you have any questions regarding the approval.