Loading...
HomeMy WebLinkAboutDRB17-0182_A4-5_1494946380.pdfMATERIALS 1. STANDING SEAM METAL ROOF - COPPER RE: SPEC 2. SYNTHETIC SHAKE ROOF RE: SPEC 3. 6X10 WOOD RAFTERS. RE: STRUCT 4. 8X10 RAFTERS RE: STRUCT 5. 2X10 FASCIA 6. 10X14 WOOD OUTLOOK BEAM RE: STRUCT. 7. 8X12 WOOD EAVE BEAM 8. COPPER SHINGLE SIDING RE: SPEC 9. DRY STACKED STONE VENEER RE: SPEC & FINISH SCHEDULE 10. RECLAIMED VERTICAL WOOD SHIP LAP SIDING W/ NO REVEAL BETWEEN BOARDS RE: SPEC & FINISH SCHEDULE 11. HORIZONTAL SHIP LAP SIDING W/ 1/4" REVEAL RE: SPEC & FINISH SCHEDULE 12. 3X3 WOOD TRIM 13. LIFT AND SLIDE DOOR SYSTEM 14. STEEL C-CHANNEL WINDOW HEADER. RE: STRUCT 15. PFSM CLAD PANEL SIDING PAINTED TO MATCH WINDOWS 16. CUT STONE CAP W/ 10 PERCENT MIN. SLOPE AT TOP TO SHED WATER 17. STEEL BEAM. RE: STRUCT 18. 8X8 WOOD STRUT W/ KNIFE PLATE CONNECTIONS @ WALL AND LAG BOLTED TO STEEL BEAM 19. TYPICAL STEEL HANDRAIL PAINTED CUSTOM BLUE/BLACK COLOR 20. 5" ROUND PFSM GUTTER AND 3" DOWNSPOUT. PIPE UNDERGROUND TO DAYLIGHT OUTSIDE OF AREA OF EXCAVATION FOR FOUNDATION AND PROVIDE POWER FOR HEAT TAPE. 21. 10X10 WOOD DECK COLUMN OVER STEEL CAP AND 4X4 HSS COLUMN BASE 22. CUSTOM STEEL CHIMNEY CAP 23. 4" THICK STONE CHIMNEY CAP 24. WOOD BEAM 25. WOOD OUTLOOK BEAM 26. CURVED GLULAM BEAM RE: STRUCT 27. STEEL SPIRAL STAIRCASE 28. PROVIDE RECESS SHADE POCKET ABOVE WINDOW GENERAL NOTES: 1. EXTERIOR LIGHTING: SEE LIGHTING PLANS FOR ALL EXTERIOR LIGHTING AND LIGHTING SCHEDULE 2. SEE EXTERIOR MATERIAL AND COLOR INFORMATION SHEET FOR MORE INFORMATION ON COLORS. SEE OUTLINE SPEC AND ARCHITECTURAL FINISH SCHEDULE. 3. ALL SNOW CLIPS (PADS) AS SHOWN ON THE ROOF AND ABOVE ALL DOORS AND DECKS TO BE AN ENGINEERED SYSTEM PER ROOF TYPE AND SLOPE INSTALLED PER MANUFACTURES RECOMMENDATIONS 4. ALL DIMENSIONS / ELEVATIONS ARE FROM T.O. FINISH U.N.O. 5. WINDOW AND DOOR HEAD / SILL HEIGHTS ARE FROM T.O. FINISH. a. B.O. WINDOW HEADER DIMENSIONS ARE MEASURED TO THE WINDOW UNIT R.O. RE: THE WINDOW SCHEDULE AND DETAILS FOR ACTUAL PLACEMENT OF THE STRUCTURAL HEADER b. MOTORIZED SHADES TO BE PROVIDE IN SHADE POCKET @ ALL LARGE WINDOW OPENINGS THROUGHOUT THE HOUSE. RE: WINDOW SCHEDULE 6. ALL EXTERIOR EXPOSED STEEL HEADERS, BEAM, KNIFE PLATES, ETC, TO BE PAINTED TO MATCH THE DARK BRONZE WINDOW COLOR. 7. EXTERIOR HANDRAIL VERTICAL AND HORIZONTAL SUPPORTS TO BE PAINTED STEEL TO MATCH WINDOW COLOR. 8. ALL MECHANICAL VENT TO BE COPPER U.N.O. 9. SEE WINDOW SCHEDULE AND RCP FOR INDICATION OF WHICH WINDOWS HAVE A CONCEALED SHADE POCKET. MAIN LEVEL FINISHED FLOOR 11' - 11 1/4" UPPER LEVEL FINISHED FLOOR 23' - 11 1/4" LOWER LEVEL FINISHED FLOOR 1' - 6 1/4" 2 A5.5 T.O. EXISTING GRADE @ 7' - 1" 2 5 8 10 11 9 6 18 12 1 7 18 18 14 3 17 3 8 A6.11 A6.10 1 1 A6.10 2 A6.1 2 A6.3 6 A6.2 4 A8.1 6 A6.6 5 A6.6 2' - 6" 3 A5.5 Q 20 75 218 20219 71 219 Q J- BOX 2 1/2" / 12" 6" / 12" 6" / 1 2" DOWN SPOUT GD GC GA GB 13' - 2" 8' - 6 1/2" 1' - 9 1/2" 23' - 6" PRE-WIRE SHADE POCKET FOR FUTURE MOTORIZED SHADE. INSTALL MANUAL SHADE. RE: RCP 75 218 20 219 20 219 71 219 60 220 76 218 T.O. STRUCTURE @ 39' - 2 1/8" 32' - 1 1/8" BUILDING HEIGHT LIMIT 33' ABOVE EXISTING GRADE @ ROOF RIDGE EXISTING GRADE DIRECTLY BELOW BUILDING HEIGHT *6A E 15 RIFT CUT OAK DOOR SIMILAR TO INTERIOR 3/4" RECLAIMED WOOD TRIM 1/2" RECLAIMED WOOD 10 WINDOW 7 A8.1 28 4 A4.5 SIM SIM B.O. HEADER @ 8' - 6 3/8" C10X15.3 W12X35 8' - 0" - --- MAIN LEVEL FINISHED FLOOR 11' - 11 1/4" UPPER LEVEL FINISHED FLOOR 23' - 11 1/4" 2 A5.5 5 8 10 9 6 16 11 12 2 5 14 17 3 18 3 12 5 A6.9 8 A6.11 A6.10 1 2 A6.2 7 A6.9 5 A6.7 A6.7 1 3 A5.5 Q 20 20 214 20 214 71 214 71 214 16 215 6" / 1 2" 2 1/2" / 12" GD GC GA GB 13' - 2" 8' - 6 1/2" 1' - 9 1/2" 23' - 6" PRE-WIRE SHADE POCKET FOR FUTURE MOTORIZED SHADE. INSTALL MANUAL SHADE. RE: RCP 2' - 6" 2' - 6" 4' - 0" Q GAS METER PAINTED TO MATCH STONE VENEER T.O. STRUCTURE @ 39' - 2 1/8" BUILDING HEIGHT LIMIT 33' ABOVE EXISTING GRADE @ ROOF RIDGE EXISTING GRADE DIRECTLY BELOW BUILDING HEIGHT *5A T.O. EXISTING GRADE @ 7' - 10 1/4" 31' - 3 7/8" 10 VERTICAL RECLAIMED SIDING APPLIED TO MASONITE DOOR ELECTRIC METER AND DISCONNECT CLOSET 1 B.O. HEADER @ 8' - 0 3/4" 28 SEE 1/A4.5 FOR SIDE ELEVATION 4 A4.5 SEE 4/A4.5 FOR SIDE ELEVATION B.O. HEADER @ 11' - 0 3/8" 6" / 12" C10X15.3 C10X15.3 T.O. C-CHANNEL @ 19' - 3 1/2" T.O. C-CHANNEL @ 19' - 3 1/2" W12X35 8 A6.8 B.O. HEADER @ 8' - 10 7/8" GARAGE SLAB PROVIDE SHADE POCKET FOR MANUAL SHADE. NO PRE-WIRE. RE: RCP - --- 8 MAIN LEVEL FINISHED FLOOR 11' - 11 1/4" UPPER LEVEL FINISHED FLOOR 23' - 11 1/4" LOWER LEVEL FINISHED FLOOR 1' - 6 1/4" 1 A5.5 22 1 16 9 8 12 18 5 18 18 2 6 17 3 3 20 11 12 16 23 5 A6.10 1 A6.10 1 A6.7 2 A5.4 Q Q 72 216 73 217 G1 G4G5 G2 17' - 4 1/2" 6' - 7 1/2" 5' - 9" 29' - 9" 3' - 0" G3 2 1/2" / 12" 6" / 12" 74 217 15 42 115 50 115 38 115 39 115 3 1/2" / 12" 3 28 4" BATHROOM EXHAUST VENTS. RE: MECH. 3 1/2" / 12" Q B.O. HEADER @ 8' - 6 3/8" 15 W12X35 DOWN SPOUT 12" WIDE x 12" TALL MECH EXHAUST . PROVIDE STONE LOUVER INFRONT OF ALUMINUM LOUVER RE: MECH PLANS 6 A6.8 Q J- BOX 1 A5.11 PRE-WIRE SHADE POCKET FOR FUTURE MOTORIZED SHADE. INSTALL MANUAL SHADE. RE: RCP 1' - 8 1/4" 42 221 1' - 5 1/2" 5' - 0 3/4" 1' - 7 7/8" 5' - 6 3/4" MAIN LEVEL FINISHED FLOOR 11' - 11 1/4" UPPER LEVEL FINISHED FLOOR 23' - 11 1/4" LOWER LEVEL FINISHED FLOOR 1' - 6 1/4" 1 A5.5 2 A5.4 G1 G4 G5 G2 G3 T.O. MAT SLAB @ 2' - 1 1/4" 6" / 12" OBLIQUE SECTION SQUARE ELEVATION T.O. CONC. @ 3' - 3 1/4" 10 16 14 2 Q Q 3 1/2" / 12" DOWN SPOUT 9 WET STORAGE 004 B.O. HEADER @ 6' - 9 3/8" C10X15.3 T.O. C-CHANNEL @ 19' - 0 1/4" T.O. TOPPING SLAB @ 2' - 1 7/8" 1/8" / 12" 1' - 0" 6" 6" Q 17 117 J- BOX 3' - 0" 3' - 0" 1 A5.11 NO WIRE FOR SHADE POCKET; MANUAL SHADE ONLY. 8' - 0" Scale Drawn by Checked by US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Issue Date REVISION 1/4" = 1'-0" 5/12/2017 3:43:55 PM A4.5 ELEVATIONS CWF HB REIMERS RESIDENCE 03/01/2016 3090 BOOTH CREEK DR. VAIL, CO CONSTRUCTION DOCUMENTS 0' 2' 4' 8' 16' 1/4" = 1'-0" 2 WEST GARAGE ELEVATION 1/4" = 1'-0" 3 EAST GARAGE ELEVATION 1/4" = 1'-0" 1 NORTH GARAGE ELEVATION 1/4" = 1'-0" 4 SOUTH GARAGE ELEVATION DRB CHANGE TO APPROVED PLANS - ADDED WINDOW @ GARAGE NORTH ELEVATION. DROPPED STONE VENEER WAINSCOT 18" No. Revision Date Revision Description 1 APRIL 26, 2016 ASI #1 5 AUGUST 12, 2016 ASI #5 8 May 12, 2017 ASI #8 8 DRB APPROVED 5/16/2017 12:00:00 AM