HomeMy WebLinkAboutDRB17-0212_Centurylink_1496180400.pdf UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to thefollowing
.If PLEASE ALTO 2 LOW UP
FtiOVAL
R COM-
MENTSFROM THE UTILITY COMPANIESyou are unable to obtain withinthat timeframe please contact
The Town of Vail. 1 i
�] �' e LI '/. t \ -;1LC N :
Subject Property Address: \ r U \ V Lot 4 Block L Subdivision:
��v; t- \hPhone: VJO 376 '2-1
Primary Contact/Owner resentative:
Plans Dated: s ' \ S / I 7
PrimaryContact/Owner Re resentative gnature
Authorized Signature Comments Date
CENTURY LINK It is the responsibility of the customer to obtain
970.328.8288(tel) locates and call to have moved any CTL 05/22/2017
kd y, facilities that are in conflict with this project.
970.328.8282(fax)
Contacts:Kelly McClemon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.244.2788(tel)
970.390.4777(cell)
970.244.2661 (fax)
Contact: Ron Smith
ron.smith@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact:Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032(tel)
970.262.4038(fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact:Tug Birk
dbirk@erwsd.org
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Michaeljohnson@cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. to
mit any
The val &re-verification if the Representative
plans raarre altered inbany wayafter td drawings to he autho izedthe above signature date.agencies for
re app
r