Loading...
HomeMy WebLinkAboutDRB17-0212_Centurylink_1496180400.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to thefollowing .If PLEASE ALTO 2 LOW UP FtiOVAL R COM- MENTSFROM THE UTILITY COMPANIESyou are unable to obtain withinthat timeframe please contact The Town of Vail. 1 i �] �' e LI '/. t \ -;1LC N : Subject Property Address: \ r U \ V Lot 4 Block L Subdivision: ��v; t- \hPhone: VJO 376 '2-1 Primary Contact/Owner resentative: Plans Dated: s ' \ S / I 7 PrimaryContact/Owner Re resentative gnature Authorized Signature Comments Date CENTURY LINK It is the responsibility of the customer to obtain 970.328.8288(tel) locates and call to have moved any CTL 05/22/2017 kd y, facilities that are in conflict with this project. 970.328.8282(fax) Contacts:Kelly McClemon kelly.mcclernon@centurylink.com XCEL HIGH PRESSURE GAS 970.244.2788(tel) 970.390.4777(cell) 970.244.2661 (fax) Contact: Ron Smith ron.smith@xcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom jvroom@holycross.com XCEL Energy 970.262.4032(tel) 970.262.4038(fax) Contacts: Britt Mace brittany.mace@xcelenergy.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk dbirk@erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michaeljohnson@cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. to mit any The val &re-verification if the Representative plans raarre altered inbany wayafter td drawings to he autho izedthe above signature date.agencies for re app r