HomeMy WebLinkAboutDRB17-0212_ERWSD_1496180400.pdf UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new constructionand
hou floorused be and elevations,in tion with preparing
ng toed
utility plan and scheduling installations. A site plan, including grading plan, plan,
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. i/ ` ‘1 ‘\"`
�G� �erl e- ` Lot BI ck� I Subdivision: l��}}a-;LJf A I 1 �'
Subject Property Address: � '�� �kj Phone: ��v .376-'21 y Z
Primary Contact 1 Owner resentative: `O�v, \ Plans Dated: S 5 / \7
Primary Contact/Owner Re resentative gnature
Comments Date
Authorized Signature Com —
CENTURY LINK
970.328.8288(tel)
970.328,8282(fax)
Contacts:Kelly McClernon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.244.2788(tel)
970.390.4777(cell)
970.244.2661 (fax)
Contact:Ron Smith
ron.smith@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact:Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032(tel)
970.262.4038(fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER&SANITATION �'��'`'` 5/.
DISTRICT tel n evict. �f✓1e 4;1\11
970.477.5449(tel) �l 5 '/ �Y
970.845.7218(fax) � I'Yl Usl �Q U �"
Contact:Tug Birk cAf2! _"' �l 1k 141445
dbiric@erwsd.org
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Michael johnson@cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198. to resolve problems identified above.
3. It is the responsibility of the utility company and the applicant
4. he ave
The-approval &re-verificatire-verification if the submitted plans Primary ntact/Owner Representative is rare altered in any way aftee the authorized drawings to tsgnabtoagencies
ure datefo
r