Loading...
HomeMy WebLinkAboutDRB17-0212_ERWSD_1496180400.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new constructionand hou floorused be and elevations,in tion with preparing ng toed utility plan and scheduling installations. A site plan, including grading plan, plan, to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. i/ ` ‘1 ‘\"` �G� �erl e- ` Lot BI ck� I Subdivision: l��}}a-;LJf A I 1 �' Subject Property Address: � '�� �kj Phone: ��v .376-'21 y Z Primary Contact 1 Owner resentative: `O�v, \ Plans Dated: S 5 / \7 Primary Contact/Owner Re resentative gnature Comments Date Authorized Signature Com — CENTURY LINK 970.328.8288(tel) 970.328,8282(fax) Contacts:Kelly McClernon kelly.mcclernon@centurylink.com XCEL HIGH PRESSURE GAS 970.244.2788(tel) 970.390.4777(cell) 970.244.2661 (fax) Contact:Ron Smith ron.smith@xcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom jvroom@holycross.com XCEL Energy 970.262.4032(tel) 970.262.4038(fax) Contacts: Britt Mace brittany.mace@xcelenergy.com EAGLE RIVER WATER&SANITATION �'��'`'` 5/. DISTRICT tel n evict. �f✓1e 4;1\11 970.477.5449(tel) �l 5 '/ �Y 970.845.7218(fax) � I'Yl Usl �Q U �" Contact:Tug Birk cAf2! _"' �l 1k 141445 dbiric@erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael johnson@cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. to resolve problems identified above. 3. It is the responsibility of the utility company and the applicant 4. he ave The-approval &re-verificatire-verification if the submitted plans Primary ntact/Owner Representative is rare altered in any way aftee the authorized drawings to tsgnabtoagencies ure datefo r