HomeMy WebLinkAboutDRB17-0215_L1 Demo_1497025440.pdfRemove the Existing
Boulder Retaining
E a s t L i o n s h e a d C i r c l e
CrosswalkCrosswalk
Security Gate
P
a
v
e
r
S
i
d
e
w
a
l
k
Bench
H a n d i c a p p e d R a m p H a n d i c a p p e d R a m p
Existing Treetops Building
to be Renovated
(see architectural drawings)
Market Entry
Chabad Entry
Loading
Dock
Garage Access
(below)
Remove theExisting
Boulder Retaining
Approximate location of
existing transformer
Preserve all existing vegetation
possible offsite in a holding
area with adequate irrigation
2) Evergreen Trees to be Removed
(typ.)
Extend the
Handicapped Ramp (ref.
Architectural Plans)
P.O. Box 1871 Avon
Colorado
81620
(970)
390-6550 ric@fieldscape.net
c
Issue Date
Sheet:
Of: three
L-1
Existing/Demolition
Plan
The Market at Vail
Tree Tops
Plaza,
Vail,
Colorado
Copyright
Fieldscape Incorporated
All Rights Reserved
This document, and the ideas and
designs incorporated herein, as an
instrument of professional service, is
the property of Fieldscape
Incorporated and is not to be used,
in whole or in part, for any other
project without the written
authorization of Ric Fields
Scale: 1"=10'-0"
North
Existing/Demolition Plan
D.R.B. May 24, '17
DRB
APPROVED
6/7/2017 12:00:00
AM