Loading...
HomeMy WebLinkAboutDRB17-0216_action_form_drb_06-21-2017_594aef4f077ec-0_1498084500.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VAIL ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Red Lion Building 2016 Application Number: DRB17-0216 Application Type: Change to Approved Date Applied: 05/31/2017 This is a request to change the approved roofing material at the entry stair of Red Lion Unit 304 from ballast to Davinci synthetic tile. The current approved roofing material is ballast roofing which is made up of small grey pebbles held in Project Description: place with tar which was to match the roofing material on the main building. It was determined by the roofing contractor that due to the slope of the new entry stair roof this type of roofing will not work here and will not be warrantied. I would like to change the roofing material at the entry stair to a Davinci single width synthetic shake roof tile, color mountain variblend. CONTACTS Contact Type: Applicant Full Name: Judge and Associates (Ben Marion) Address: 105 Edwards Village Blvd. Edwards, CO 81632 Phone: 9709497034 Contact Type: Property Owner Full Name: BLUE MOUNTAIN INVESTMENTS LLC Address: Phone: None Project Address: 304 BRIDGE ST R3 (210108253009 R3) (210108253009) Job Site Location: R3 Legal Description: Subdivision: VAIL VILLAGE FILING 1 Lot: E - H Block: 5A Parcel Number: 210108253009 BOARDS/STAFF ACTION Motion By: Kjesbo Action: Approved Second By: Cahill Vote: 5-0-0 Date: 06/21/2017 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - The applicant shall revise the plans to indicate a dark bronze or copper metal shingle roofing material at the entry stair of Unit 304. - The applicant shall revise the plans to indicate the use of ballast roofing material, to match the structure's existing roofing, on the north elevation roof plane located above the proposed stair entry and below the proposed Unit 3 bedroom addition. Planner: Matt Panfil