Loading...
HomeMy WebLinkAboutDRB17-0216_DRB Letter 3-22-17_1496864940.pdf 0 judge+assoc ATES ARCHITECTS • PLANNERS May 31, 2017 Town of Va it Design Review Board Changesto approved plans Re: Red Lion Condominium Unit R-3 The following isa detailed description of the change being requested from the original approval of Red Lion Condominium unit 304. This isa request to change the approved roofing material at the entry stair of Red Lion Unit 304 from ballast to Davinci synthetic tile. The current approved roofing material is ballast roofing which is made up of small grey pebblesheld in place with tarwhich wasto match the roofing material on the main building. It wasdetermined by the roofing contractor that due to the slope of the new entry stair roof the ballast type of roofing will not work at the entry stair roof. I would like to request that the roofing material at the entry stair be changed to Davinci single width synthetic shake roof tile, color mountain variblend . I have included drawingsof the area requested to be changed and a sample of the proposed tile. Please contact Ben Marion (970)949-7034 benm@vagarchitects.com with any questions, clarificationsor need foradditional information. Changes have been clouded in red on the drawing sheetswith notes. If I can provide any further information please let me know. Sincerely, Ben Marion Project Manager Be nm®ragarchitects.corn www.va g a rc hite cts.c o m O ? JI ?TES 21) celelsretirs9 ARCHITECTS + FLANNER 970.949.7034 PO Box 1734 Vail, CO 81658-1734 Physical Address: (970)949-7034 Mailing Address: 105 Edwards Village Blvd, P.O.Box 1734 Suite G104 Vail,CO 81658-1734 Edwards,CO 81632 email: general@vagarchitects.com