Loading...
HomeMy WebLinkAboutDRB17-0224_SL-3X_ArchGuide_1497301140.pdfSpecifications Additional information can be found online at www.heatnglo.com MODEL HEIGHT FRONT WIDTH BACK WIDTH DEPTH VIEWING AREA Actual Framing Actual Framing Actual Framing Actual Framing Please consult the manufacturer’s installation manual for all details and requirements before making a final design layout decision. SL-3X Direct Vent Gas Fireplace MODEL FRONT WIDTH BACK WIDTH HEIGHT DEPTH GLASS SIZE SL-3X Actual Framing Actual Framing Actual Framing Actual Framing 24-1/8 x 16333422-3/4 34 32-3/8 32-3/4 16-1/4 16-1/4 SL-3X Ø GAS LINE ACCESS 33[838] 28-1/8[714] 24-1/8[613] 16[406] 32-1/8[816] 3-1/2[89] 6-7/8[175] 21-3/8[543] 32-3/8[822] 34-1/2[876] 8[203] 8-3/4[222] 16-1/4[413] 1/2[13]22-3/4[578]11-3/8[289] 15-7/8[403] 6-5/8[168] 2-1/8[54] 6[152]1[25] 28[711] 5[127] 14[356] 9-1/8[232] ELECTRICALACCESS Ø ØHEAT-ZONE® ACCESS Ø GAS LINE ACCESS 33[838] 28-1/8[714] 24-1/8[613] 16[406] 32-1/8[816] 3-1/2[89] 6-7/8[175] 21-3/8[543] 32-3/8[822] 34-1/2[876] 8[203] 8-3/4[222] 16-1/4[413] 1/2[13]22-3/4[578]11-3/8[289] 15-7/8[403] 6-5/8[168] 2-1/8[54] 6[152]1[25] 28[711] 5[127] 14[356] 9-1/8[232] ELECTRICALACCESS Ø ØHEAT-ZONE® ACCESS 28 [711] 25-1/16[637]26-3/4[680] 2-5/8[67] 1-5/8 [41] 28-3/4 [730] 1-1/8[29] 27-5/16[694] 29-3/8 [746] 29-1/16 [738] Firescreen Front Chateau and Halston Fronts Specifications GS/HNG/SL-3X_1016 PRODUCT LISTING CODES US ANSI Z21.88a-2007 CAN CSA 2.33a-M2007 UL307B Additional information can be found online at www.heatnglo.com Product information provided is not complete and is subject to change without notice. Product installation must adhere strictly to instructions accompanying product to avoid risk of fire and potential injury. Lakeville, MN Web: heatnglo.com Phone: 888-427-3973 AREA TO COMBUSTIBLES (in inches) CLEARANCE TO CEILING 32 COMBUSTIBLE/NON-COMBUSTIBLE FLOOR 0 BEHIND APPLIANCE 1/2 SIDES OF APPLIANCE 1/2 FRONT OF APPLIANCE 36 MINIMUM FIREPLACE CLEARANCES APPLIANCE LOCATION WALL PENETRATION MANTEL LEG/WALL PROJECTIONS K C A L I B G See Installsection 5.Dfor Alcoveinstallation J J G A F HM FRAMING DIMENSIONS CLEARANCES TO COMBUSTIBLES C B D A A Rough Opening (Width) B Rough Opening (Height) C Rough Opening (Depth) D Rough Opening (Width)DVP pipe SLP pipe DVP pipe SLP pipe in 10 8-5/8 32-3/4 16-1/4 16-1/4 34 mm 254 219 832 413 413 864 5 6 7 8 9 10345 1211109876 TOP OF HOOD 4 12 13 11 32 CEILING MANTEL PROJECTIONS SL-3X Model A B C E F G SL-3X in 39-1/2 34 55-7/8 1 1/2 44 mm 1003 864 1413 25 13 1117 H I J K L M SL-3X in 62-1/4 16-1/4 48-1/2 68-3/4 13-1/2 7-1/2 mm 1581 413 1232 1737 343 191 34-1/2"[876]21-3/8"[543] 35-1/2"[902]*22-3/8"[568]* 10" 10"10" 12" *Shows center of vent hole for top or rear venting. Center of hole is 1" above the center of the horizontal vent pipe. 3ft. maximum Top View 2-7/8" minimum 1/2" minimum Unlimited Top View 5-7/8" minimum 3" minimum Mantel Leg Projection (acceptable on both sides of opening) Wall Projection (acceptable on one side of opening) 32"[813] 1/2" [13] 1/2" [13] 0" 0"36" [915] Measure from top of unitopening or from top of hood