Loading...
HomeMy WebLinkAboutDRB17-0246_action_form_drb_06-29-2017_59558d5b2e35b-0_1498830420.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VAIL ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: North Nevada LLC Application Number: DRB17-0246 Deck/Driveway 2016 Application Type: Change to Approved Date Applied: 06/14/2017 The dining room window is being revised from a pair of casements to 1 picture window. The retaining wall at the drive will be replaced with rectilinear boulders in lieu of cladding the existing ret. wall as approved. (We found out that the existing Project Description: ret. walls where originally constructed of small round stones with mortar and no substrate) The Contractor is proposing that they replace the retaining wall with rectilinear boulders and hand set boulders. The boulder will still generally match the stone veneer proposed and approved on the house. Just a different installation technique and may result in some larger stones/boulders. CONTACTS Contact Type: Applicant Full Name: Martin Manley Architects (Jeff Manley) Address: po box 1587 pob 5668 Eagle, CT 81631 Phone: 9703281299 Contact Type: Property Owner Full Name: NORTH NORTH NEVADA LLC - ETAL Address: Phone: None Project Address: 2460 BALD MOUNTAIN RD (210103301004) (210103301004) Job Site Location: Legal Description: Subdivision: VAIL VILLAGE FILING 13 Lot: 20 Block: 2 Parcel Number: 210103301004 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 06/29/2017 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - The applicant shall be required to complete a revocable right of way permit for improvements within the public right of way prior to requesting a final public works inspection. Planner: Chris Neubecker