Loading...
HomeMy WebLinkAboutDRB17-0189_O2 Equipment Information and Layout_1499808660.doc06/13/17 A Vail Valley Hospital Modified 07/11/17 based on email between Ryan Collier (DPA) and Chuck Graves (US Welding) to provide 36” clearance on west side of enclosure per Chris Brunette request. Assumptions Estimated customer product usage Proposed annual volume year: 5,300,000 scf, 46,990 gal Proposed annual volume day: 14,502 scf, 126 gal Proposed annual volume hour: 604 scfhr, 5.25 gal Delivery cycle: 14–18 days with 2280 gallons net Note: Not to scale. The schedules provided are to be used for reference purposes only, and cannot substitute for structural design for particular site conditions.  Refer to local codes, geotechnical reports and structural design documentation for specific requirements. Fence: Fencing to be installed after the installation Scale: 1/8 in approx. = 1 ft