HomeMy WebLinkAboutDRB17-0261_DRB17-0261 action form_1499121300.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Wolf Residence 2017 Application Number: DRB17-0261
Application Type: Exterior Alteration Date Applied: 06/24/2017
Project Description: Remove a sliding glass door on the east side of the dining room and replace it
with a wall finished to match the rest of the exterior walls.
CONTACTS
Contact Type: Applicant
Full Name: Pam Wolf
Address: 770 Potato Patch Dr. #4 Vail, CO 81657 Phone: 3035375052
Contact Type: Property Owner
Full Name: WOLF, DAVID O. & PAMELA M.
Address: Phone: None
Project Address: 770 POTATO PATCH DR 4 (210106319004 4) (210106319004)
Job Site Location: 4
Legal Description: Subdivision: VAIL POTATO PATCH FILING 1 Lot: 6 Block: 2
Parcel Number: 210106319004
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date: 07/03/2017
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- All stucco and paint shall match the existing stucco and paint colors on the existing building.
Planner: Chris Neubecker