HomeMy WebLinkAboutDRB17-0278_HOA Approval_1499905980.pdf PINE RIDGE TOWNHOUSES ASSOCIATION FOR OFFICE USE ONLY
ARCHITECTURAL CONTROL COMMITTEE (ACC) IMPROVEMENT REQUEST Date Received
Critical Date
COMMUNITY MANAGEMENT SPECIALISTS, INC. Date Sent to ACC
1224 Wadsworth Blvd, Lakewood, CO 80214
720/377-0100* *720/377-0111 Fax Date Received from ACC
Rep.
Name:.."�Ork Si-•Q‘ -3-1 M V e, Filing: Block: Lot:
Address: ' 7 Clig/M2/0X # 1.3 I i�' 1tid ci r/ 1.3 Here Phone: 3 .'o - 'S ' -.6 /5/' Dom_
City: 2a, State: (7/e-tt t Zip: 3/4,)57 Work Phone: 7:)0 -5SO --56'12
_i 1x,
Mailing address if different than proposed improvement(s)
5704 eusf 1C- Ieno/J T)c- 130,ev(,,L co go3o I
My request involves the following type of improvement:
❑ Satellite Dish(Satellite dishes cannot be installed on roofs. The preferred location is on the patio/deck on a free
standing pole.)
❑Air Conditioner ❑ Patio/Deck Improvements or Changes
P/W ni dow Replacements ❑ Front Door Replacement
❑Other
Describe Improvements: (be specific)
i + lcwn t) A /au- c c & Q3 ttt/. t„ 1)-(411L. i
'+ 1,02I, till, -rave I 12r P .b-cu c%c .ti
Planned Installation Date: 1 —6:/,(4s. /I— .5-`1--pf is
I understand that I must receive approval of the Architectural Control Committee or Board of Directors in order to proceed.
I understand that AC approval does not constitute approval of the local building department and that I may be required to
obtain a building permit. I agree to complete improvements promptly after receiving approval. I have read the instruction
sheet and will comply. I also understand that I shall maintain proper drainage away from my foundation and not impede
proper drainage swales on my lot when installing landscape or building improvements. Upon the completion of my
nnNiovernerii r neieuy duuiurice uie Hrchitecruldl 1.wilii1illlCG olio v,iilitunuy rvianagement Specialists to enter onto my
property for exterior inspection at a mutually agreed upon time.
v1/
Date: J cote_ c.Zi,-Q f -- Homeowners Signature: j l , 7 l
,v
L.:72. 0,V,-; 1.-2r..-L_ is
V
AC ACTION:
Approved as Submitted.
❑ Approved subject to the following requirements
❑ Disapproved:
Architectural Control Committee Member <„a/VA/ ^ 411 Date: 7 - /U —/"�
Please remember to get any p mits that may be required for your improvement from the City before construction begins.