Loading...
HomeMy WebLinkAboutE16-0179.pdf Department of Community Development 75 South Frontage Road West OHO Vail, CO 81657 TOWN O Tel: 970-479-2139 www.vailgov.com ELECTRICAL PERMIT Electrical Permit Submittal Requirements Including Heat Tape Installation _Floor plan/Site plan showing proposed work _Occupancy Group listed on plans _Load Calculations and one-line diagram when loads or circuits are being added _Building Type NOTE:For Multi-Family and Commercial buildingsā€”plans and calculations must be prepared by a Colorado Licensed Electrical Engineer Project Street Address: 5157 Gore Circle Project#: (Number) (Street) (Suite#) Building Permit#: Building/Complex Name: Electrical Permit#: Project Information: Owner Name: Jim Johnson Lot#: Block# Subdivision: Parcel#2099-182-03-012 (For Parcel#,contact Eagle County Assessors Office at(970)328-8640 or visit Define Scope and Location of Work: www.eaglecounty.us/patie) Interior and exterior remodel. Square footage of Contractor Information GE Johnson Construction Companyhouse stays the same Business Name: Business Address: 25 N. Cascade Ave, Suite 400 City Colorado Springs State: CO Zip: 80903 Contact Name: John Halloran Contact Phone: 970-471-6048 Contact E-Mail: halloranj@gejohnson.com (use additional sheet if necessary) I hereby acknowledge that I have read this application,filled out in full the Includes Temporary Service: (C)Yes (1)No information required,completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the infor- mation and plot plan,to comply with all Town ordinances and state laws, Work Class: and to build this structure according to the town's zoning and subdivision New(C ) Addition (C ) Remodel ((i) Repair(r) codes, design review approved,International Building and Residential Codes and other ordinances bf the Town applicable thereto. Other(C) X Type of Building: Single-Family(Ca) Duplex(C Owner/Owner's Representative Signature(Required) Applicant Information Multi-Family(C) Commercial (C) Restaurant(C) Applicant Name: John Halloran Other C) 970-471-6048 Provide BOTH square footage of area of work Applicant Phone: AND Valuation (Labor&Materials) Applicant E-Mail: halloranj@gejohnson.com 3769 Amount of SQ Ft.: Additional Authorized ProjectDox Users12,000 Full Name: John Halloran Electrical $: E-Mail:halloranj@gejohnson.com Full Name: Rebecca Woodard Date Received: E Mail:woodardr@gejohnson.com For Office Use Only: Fee Paid: Received From: Cash Check# CC: Visa/ MC Last 4 CC# Auth # Rev.2015-Dec Instructions for calculating ELECTRICAL permit fees: The Electrical permit fees listed in this section are mandated by the State of Colorado, Colorado Revised Statute §12-23- 117(3). They are subject to review and adjustment annually. Fees are based on either RESIDENTIAL or ALL OTHER FEES. Do not use both categories to determine your fees. Please note the Town of Vail still requests you list the valua- tion of work on RESIDENTIAL permits as we report on this data. The State of Colorado allows local jurisdictions to charge up to 15% above their mandated fees as listed below. Inspections: Permit fees include TWO inspections only. For ALL additional inspections, including re-inspection for cor- rections issued by the electrical inspector, a $57.50 fee is required. This fee must be paid before any additional inspec- tions will be performed. Construction Use Tax: See formula listed on page 1 in the Building Permit Fees section. Construction use tax will be applied to any electrical permit with a valuation exceeding $10,000 where there is NO building work. Will Call: $5.00 applied to every electrical permit. When calling for your inspection, simply state that you would like "Will Call"and leave the best contact name and number. The inspector will call you on his or her way to your site. Section A. RESIDENTIAL: This fee (based on the enclosed living area only) includes construction of, or remodeling or addition to a single family home,a unit in a duplex,a condominium, or a town house. If you are only providing or changing a service and not wiring any portion on the above, see section 'B'on page 5 for correct permit fee. TOTAL Fee with 15% Square Footage for Living Area State Fee added (1) Not more than 1,000 square feet 1000.00 115.00 (2) 1,001 square feet and not more than 1,500 square feet 150.00 172.50 (3) 1,501 square feet and not more than 2,000 square feet 200.00 230.00 (4) Per 100 square feet in excess of 2,000 square feet 10.00 11.50 Example: 2235 sq ft home The base fee for 2000 sq ft(of the 2235 sq ft total)is$230(see item (3)above) 230.00 The remaining 235 sq ft is rounded up,per section(4)above,to 300 sq ft(3 x$11.50= $34.50) 34.50 TOTAL $264.50 Section B.ALL OTHER FEES including some residential installations that are not based on square footage (not in a living area, i.e. garage, shop, and photovoltaic, etc.). Fees in this section are calculated form the total cost to customer, including electrical materials, items and labor-whether provided by the contractor or the property owner. Use this chart for a service connection, a temporary meter, and all commercial installations. Such fees shall be computed as follows: (See'C'below for the permit fees for a mobile/modular home and travel trailer parks). Valuation of Installation TOTAL Fee with (based on cost to customer of labor,materials and items) State Fee 15%added (1) Not more than$2,000 100.00 115.00 (2) $2,001 and above 10.00 11.50 Example: The cost of the installation is$5,150(round up to$6,000) The base fee is calculated from section(2)above divided by 1000; 6 x$11.50= $69.00 69.00 Plus$115.00 115.00 TOTAL $ 184.00 TOTAL Fee with 15%added C. Mobile/Modular home and travel trailer parks,per space 100.00 57.50 D. Re-inspection fee for all of the above 50.00 57.50 E. Add Fee for Extra inspections 50.00 57.50 F. Add Fee for Temporary heat release 50.00 57.50 4