Loading...
HomeMy WebLinkAboutE17-0097_PV Production Metering Diagram_1500652260.pdf IA a PHOTOVOLTAIC (PV) INSTALLATION REQUIREMENTOj S 111' General Notes: 07/21/17 1. Utility meter location and installation shall be in compliance with this guidebook. If a service does not have a Disconnect that is compliant with Section 4.0 of this guidebook, a compliant Disconnect shall be installed. 2. The use of piercing tap connectors within a self-contained meter socket or CT enclosure/compartment is strictly prohibited. Holy Cross will not permit the use of the meter socket or CT enclosure/compartment as a junction box unless it is used in accordance with its listing and labeling. 3. Grounding and bonding of all equipment shall be in accordance with the NEC code required by the authority having jurisdiction. 4. All 480-Volt services will require instrument metering that is compliant with Section 4 of this guidebook. 5. All components must be labeled in accordance with the NEC code required by the authority having jurisdiction. Additional labeling may be required by Holy Cross Energy (see Drawing 8.43 for samples). Production Meter Notes: A. Appropriate meter socket, as described in Section 4 and Section 9, are to be furnished and installed by consumer. B. Production and Utility meters are provided and installed by Holy Cross Energy. C. Rain tight, load break fused disconnect or circuit breaker is required at meter location. It may be a combined meter/disconnect (factory built/UL listed) assembly. Disconnect must be on load side of meter and be located within 24 inches of meter socket. D. Utility Accessible AC Disconnect shall be located within ten feet of the utility meter, shall be lockable and provide a visible open to HCE personnel (i.e. Knife Blade). It shall be labeled in accordance with the requirements for Meter Identification in Section 7.B.2.a of this guidebook. This is optional when the production meter socket is self-contained. E. Inverter based, member-owned generation shall be wired to the load side terminals of the Production Meter (bottom of meter block). F. Production meter socket shall be marked with a stamped brass, aluminum, or stainless steel tag, indicating the address including the unit in accordance with the requirements for Meter Identification in Section 7.B.2.a of this guidebook. G. Production meter socket shall be located within ten feet and line of sight of the utility meter. If there is any reason this cannot be accomplished, a site plan showing proposed equipment locations shall be submitted for review. HCE shall review and approve or deny the proposed equipment location. Site meetings can be arranged on request. H. A meter socket cover shall be installed at all times to secure the meter socket prior to the installation of the production meter. I. A member owned (optional) meter may be connected behind the utility accessible disconnect. Such a meter will not be supplied nor maintained by Holy Cross. J. Holy Cross' production meter must be protected by an overcurrent protection device with a minimum interrupting rating of 10,000 amps symmetrical current or greater. Such device must meet the distance requirements in Section 4.0 of this guidebook. K. All components must be labeled in accordance with the NEC code required by the authority having jurisdiction. Additional labeling may be required by Holy Cross Energy (see Drawing 8.43 for samples). 8.40