HomeMy WebLinkAboutF15-0050_F15-0050 cut sheets 4_1438621380.pdf1
2
3
4
49
Part 1:
Connecting of pipe work to the aquatherm red pipe sprinkler outlet
The connection is described in picture 1 as follows:
The base part of the sprinkler outlet (1) is screwed with 4 screws on the
shuttering.
Brass plug (2), upper part of the sprinkler outlet (3) and aquatherm red
pipe connection piece (4) are connected to each other and plugged onto
the base part of the sprinkler outlet (1), so that part 3 is flush with the
shuttering.
detailed information regarding the different dimensions of the
sprinkler outlet please take from tables on pages 19 and 20!
colour of plastic sleeve may differ.
LAyING OF AqUATHeRM Red PiPe IN THE CONCRETE
Upper part sprinkler outlet
Brass plug
Base part sprinkler outlet
Picture 1
LAyinG in THe concReTe
50
The aquatherm red pipe sprinkler connection is finished (picture 2).
When removing the shuttering (after pouring of the concrete) the base part of
the sprinkler outlet (1) is pulled out of the upper part of the sprinkler outlet (3).
The brass plug (2) is unscrewed from the aquatherm red pipe-connection pi-
ece (part 4). Now, the upper part of sprinkler outlet (3) must be pulled out
of the concrete easily with the aquatherm red pipe extraction tool (Art- No.
50290).
The sprinkler connection (picture 3) can be completed very easily. The, acc. to
CEA 4001, required distance from the sprinkler head to the completed ceiling,
can be accomplished with the compensating fitting from the sprinkler connec-
tion thread up to the aquatherm red pipe connecting piece (see drawing page
52).
LAyING OF AqUATHeRM Red PiPe IN THE CONCRETE
Picture 3
LAyinG oF AqUATHeRM Red PiPe-PiPeS in THe
concReTe
Picture 2
LAyinG in THe concReTe