Loading...
HomeMy WebLinkAboutF15-0050_F15-0050 cut sheets 4_1438621380.pdf1 2 3 4 49 Part 1: Connecting of pipe work to the aquatherm red pipe sprinkler outlet The connection is described in picture 1 as follows: The base part of the sprinkler outlet (1) is screwed with 4 screws on the shuttering. Brass plug (2), upper part of the sprinkler outlet (3) and aquatherm red pipe connection piece (4) are connected to each other and plugged onto the base part of the sprinkler outlet (1), so that part 3 is flush with the shuttering. detailed information regarding the different dimensions of the sprinkler outlet please take from tables on pages 19 and 20! colour of plastic sleeve may differ. LAyING OF AqUATHeRM Red PiPe IN THE CONCRETE Upper part sprinkler outlet Brass plug Base part sprinkler outlet Picture 1 LAyinG in THe concReTe 50 The aquatherm red pipe sprinkler connection is finished (picture 2). When removing the shuttering (after pouring of the concrete) the base part of the sprinkler outlet (1) is pulled out of the upper part of the sprinkler outlet (3). The brass plug (2) is unscrewed from the aquatherm red pipe-connection pi- ece (part 4). Now, the upper part of sprinkler outlet (3) must be pulled out of the concrete easily with the aquatherm red pipe extraction tool (Art- No. 50290). The sprinkler connection (picture 3) can be completed very easily. The, acc. to CEA 4001, required distance from the sprinkler head to the completed ceiling, can be accomplished with the compensating fitting from the sprinkler connec- tion thread up to the aquatherm red pipe connecting piece (see drawing page 52). LAyING OF AqUATHeRM Red PiPe IN THE CONCRETE Picture 3 LAyinG oF AqUATHeRM Red PiPe-PiPeS in THe concReTe Picture 2 LAyinG in THe concReTe