HomeMy WebLinkAboutF15-0069_FP12_1458056880.pdfProvide sprinkler
head for trash
chute per CCD
#019 - PCL
AE to confirm, sprinkler heads
to align with lights - PCL
Sprinkler head locations in
trash chutes to be
coordinated. - PCL
Corrections or comments made on the shop drawings
during this review do not relieve contractor from compliance
with requirements of the drawings and specifications. This
check is only for review of general compliance with the
design concept of the project and general compliance with
the information given in the contract documents. The
contractor is responsible for: confirming and correlating all
quantities and dimensions; selecting fabrication process
and techniques of construction; coordinating his work with
that of all other trades; and performing his work in a safe
and satisfactory manner.
BCER Engineering, Inc.
Date By
REVIEWED REVISE AND RESUBMIT
REJECTED MAKE CORRECTION NOTED
4
09/25/15 T. Brand
Parrallel fittings -
not wye fittings
parrallel
connections vs
wye.
Vail Fire & Emergency Services
03/15/16