HomeMy WebLinkAboutF15-0091_plan 1_1451581860.pdfVail Valley Medical
Center
MOP# 0032a
Level 1 Barriers
UP
F.V.C.
(E)
F.V.C.
(E)
PHYSICAL
THERAPY
GYM
ELEC
1'-5" 8'-10"
RISER COORDINATION
LEVEL 1
10/23/15
RISERS 6'-3 3/4"
Existing Plastic Barrier at
Doorway.
Existing Hard Barrier.
HEPA Scrubber
HEPA Vacuum
Stick Mat
Shaft walls to be
constructed in a later
phase.
Approx. Location of
penetrations in ceiling
above.
1/2" copper line to be
cut back to main in
corridor.
4" soil pipe to remain for
this phase.
Duct to be
relocated/removed.
Sprinkler head in office
to be relocated to the
north within room.
Vail Fire & Emergency Services
12/31/15